Ad
related to: bangkok rail journey planner live departures schedule tomorrow date
Search results
Results From The WOW.Com Content Network
The BTS Skytrain Map of Bangkok urban transit systems. Bangkok Metropolitan Region is served by 9 rapid transit rail lines as of 2023. The BTS Skytrain consists of three lines, the Sukhumvit Line, Silom Line and Gold Line.
This revised master plan included monorail and light rapid transit lines to enhance Bangkok into a rail transportation metropolis. The plan consisted of 11 railway projects with a combined length of 206 kilometres (128 mi), as follows;
Greater Bangkok commuter rail is a commuter rail system in Bangkok Metropolitan Region, Phra Nakhon Si Ayutthaya Province, Saraburi Province, Lopburi Province, Suphan Buri Province, Ratchaburi Province, Chacheongsao Province, Nakhon Nayok Province, Prachinburi Province, and Samut Songkhram Province. It runs from and to the outskirts of the city ...
The following lists the stations of all urban rail transit systems in Bangkok and the surrounding Bangkok Metropolitan Region, including the BTS, MRT, Airport Rail Link and SRT Red Lines. It does not include the 12 stations of the Bangkok BRT. The table below lists 192 stations in operation, comprising: 47 stations on the BTS Sukhumvit Line
Along with the BTS Skytrain and the Airport Rail Link, the MRT is part of Bangkok's rail transportation infrastructure. The BEM-operated MRT lines have 526,000 passengers each day as of August 2024 (Blue Line 453,000 and Purple Line 73,000) with 54 operational stations and a combined route length of 71 kilometers (44 mi). [4]
Eastern Bangkok Monorail (Yellow Line) under concession from MRTA Northern Bangkok Monorail (Pink Line) under concession from MRTA. Airport Rail Link: 2010 1 28.6 km (17.8 mi) 8 Asia Era One under concession from SRT [3] SRT Red Lines: 2021 2 41 kilometres (25 mi) 14 SRT: Total 10 275.55 km (171.22 mi) 162
The Red Line Mass Transit System Project is a commuter rail system serving the Bangkok Metropolitan Region in Thailand. Construction began in January 2009, and free public trial operation began on 2 August 2021, when Bang Sue Grand Station opened, with full commercial service starting in November 2021. [2]
The 28.6-kilometer (17.8 mi)-long Airport Rail Link opened for service on 23 August 2010. [2] In the future, Airport Rail Link will extend from Phaya Thai towards Krung Thep Aphiwat Central Terminal and Don Mueang International Airport. Its rail will also be used for the proposed Don Mueang–Suvarnabhumi–U-Tapao high-speed railway.