Most of the bridges still under construction at this time were delayed for investigation of the basic design principle. Some were abandoned and rebuilt as a different form of bridge altogether. Most of those that remained as box girder bridges, such as Erskine Bridge (illus.), were either redesigned, or had additional stiffening added later ...
Structural failure — support piers collapsed 7 killed, 0 injured Complete failure of two spans on I-5 Due to extreme rainfall, the Arroyo Pasajero experienced high volumes of water at high speed. This caused scouring of the river bed undermining the support piers of both spans. Elhovo bridge over the Tundzha river [43] Elhovo, Yambol Province
Completed falsework: Decking and some formwork has been added. The illustrations are of modern pipe-column falsework, used to support the formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge. When the supports are complete, wood beams and plywood or reusable ...
Since the wooden or metal form that supported the casting of the concrete was elevated, the forms were supported on falsework, in this case using vertical pipe sections, steel beams, and diagonal cables. A wooden deck was then erected atop the falsework to support the lowest forming surface.
This is a list of structural failures and collapses of buildings and other structures including bridges, dams, and radio masts/towers. This is a dynamic list and may never be able to satisfy particular standards for completeness.
[1]: 117 Bragg also considered the 1958 collapse of a span of the Second Narrows Crossing in British Columbia, the 1966 collapse of falsework at Welshpool road overpass in Western Australia, the 1966 collapse of falsework at the Heron Road Bridge in Ontario, Canada, the 1971 collapse of falsework at the Birling Road Overbridge in Kent; the 1972 ...
Shoring is designed to prevent collapse where shielding is only designed to protect workers when collapses occur. Concrete-structure and stone-building shoring, in these cases also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads.
Formwork for beams takes the form of a box that is supported and propped in the correct position and level. The removal time for the formwork will vary with air temperature, humidity and consequent curing rate. Typical striking times are as follows (using air temperature of 7-16 °C): Form work. Beam sides: 9–12 hours. Beam soffits: 8–14 days.