When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Overhead line - Wikipedia

    en.wikipedia.org/wiki/Overhead_line

    The installation of overhead lines may require reconstruction of bridges to provide safe electrical clearance. [20] Overhead lines, like most electrified systems, require a greater capital expenditure when building the system than an equivalent non-electric system. While a unelectrified railway line requires only the grade, ballast, ties and ...

  3. Structure gauge - Wikipedia

    en.wikipedia.org/wiki/Structure_gauge

    A related but separate gauge is the loading gauge: a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. The difference between these two gauges is called the clearance .

  4. Overhead power line - Wikipedia

    en.wikipedia.org/wiki/Overhead_power_line

    Overhead lines or overhead wires are used to transmit electrical energy to trams, trolleybuses or trains. Overhead line is designed on the principle of one or more overhead wires situated over rail tracks. Feeder stations at regular intervals along the overhead line supply power from the high-voltage grid.

  5. Three-phase AC railway electrification - Wikipedia

    en.wikipedia.org/wiki/Three-phase_AC_railway...

    The overhead wiring, generally having two separate overhead lines and the rail for the third phase, was more complicated, and the low frequency used required a separate generation or conversion and distribution system. Train speed was restricted to one to four speeds, with two or four speeds obtained by pole-changing or cascade operation or both.

  6. 25 kV AC railway electrification - Wikipedia

    en.wikipedia.org/wiki/25_kV_AC_railway...

    In this system, the current is mainly carried between the overhead line and a feeder transmission line instead of the rail. The overhead line (3) and feeder (5) are on opposite phases so the voltage between them is 50 kV, while the voltage between the overhead line (3) and the running rails (4) remains at 25 kV. Periodic autotransformers (9 ...

  7. Dual electrification - Wikipedia

    en.wikipedia.org/wiki/Dual_electrification

    Dual electrification is a system whereby a railway line is supplied power both via overhead catenary and a third rail. This is done to enable trains that use either system of power to share the same railway line, for example in the case of mainline and suburban trains (as used at Hamburg S-Bahn between 1940 and 1955). [1]

  8. Overhead line crossing - Wikipedia

    en.wikipedia.org/wiki/Overhead_line_crossing

    However, in the first years building overhead line when crossing a railway line or a road, a scaffold under the line was required. Later in Germany and some other countries on each end of a powerline crossing of a state-operated railway, a dead-end tower was required, which can still be seen on some old power lines.

  9. Railway track - Wikipedia

    en.wikipedia.org/wiki/Railway_track

    A railway track (CwthE and UIC terminology) or railroad track (NAmE), also known as permanent way (CwthE) [1] or "P Way" (BrE [2] and Indian English), is the structure on a railway or railroad consisting of the rails, fasteners, sleepers (railroad ties in American English) and ballast (or slab track), plus the underlying subgrade.