Ads
related to: material call out on drawing board software download fullhouzz.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
The [main] field of the drawing, as opposed to other areas of it, such as the parts list , general notes (G/N), flagnotes , title block , rev block , bill of materials (B/M or BoM or BOM), or list of materials . Rationales for drawing changes that are noted in the rev block often use these abbreviations for brevity (e.g., "DIM 14.00 was 12.50 ...
A material take off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. Thereafter, the material take off is used to create a bill of materials (BOM). Procurement and requisition are activities that occur after the bill of materials is complete, distinct from Inspection.
And of course the tools also include drawing boards (drafting boards) or tables. The English idiom "to go back to the drawing board", which is a figurative phrase meaning to rethink something altogether, was inspired by the literal act of discovering design errors during production and returning to a drawing board to revise the engineering drawing.
Smaller drawing boards are produced for table-top use. In the 18th and 19th centuries, drawing paper was dampened and then its edges glued to the drawing board. After drying the paper would be flat and smooth. The completed drawing was then cut free. [3]: 1-2 Paper could also be secured to the drawing board with drawing pins [4] or even C-clamps.
EAGLE is a scriptable electronic design automation (EDA) application with schematic capture, printed circuit board (PCB) layout, auto-router and computer-aided manufacturing (CAM) features.
The size or unit of sample material usually is specified. For some materials, a mock-up or sample panel is necessary. A common example of a sample panel is a wall mock-up. This is a full size mock-up of a wall assembly and can include window, exterior veneers and waterproofing.