Ads
related to: sewer cleanout cap tool home depot with light bulb size
Search results
Results From The WOW.Com Content Network
The design was initiated by the U.S. EPA and the Lighting Research Center in 2004, in order to facilitate the deployment of compact fluorescent light bulbs with replaceable ballasts. [ 1 ] The GU24 fitting is compliant with a 2008 ruling by the California Energy Commission under Title 24 ( California Building Standards Code ) to require high ...
The suffix after the G indicates the pin spread; the G dates to the use of Glass for the original bulbs. GU usually also indicates that the lamp provides a mechanism for physical support by the luminaire: in some cases, each pin has a short section of larger diameter at the end (sometimes described as a "peg" rather than a "pin" [2]); the socket allows the bulb to lock into place by twisting ...
High-pressure sewer jetters can be mounted on trolleys, inside vans or on trailers. The power of a sewer jetter ranges from 1,000 psi (68 atm) to 5,000 psi (340 atm). Sewer jetter nozzles come in different sizes and applications; a bullet-type nozzle with a streamlined profile can clear a hole for the larger root cutting nozzle.
A sewer pipe is normally at neutral air pressure compared to the surrounding atmosphere.When a column of waste water flows through a pipe, it compresses air ahead of it in the system, creating a positive pressure that must be released so it does not push back on the waste stream and downstream traps, slow drainage, and induce potential clogs.
Roto-Rooter's sewer cleaning service allowed homeowners to avoid digging up lawns and landscaping to reach underground sewer pipes. This breakthrough was a revolutionary concept. In the 1930s and 40s, Roto-Rooter featured an illustration of a mound of dirt over a recently excavated sewer pipe with the caption, "Why put a grave in your yard?"
Since clean-out augers are limited in length, clean-outs should be placed in accessible locations at regular intervals throughout a drainage system (including outside the building). Minimum requirements are typically at the end of each branch in piping, just ahead of each water closet, at the base of each vertical stack and inside and outside ...