Search results
Results From The WOW.Com Content Network
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
The first of the cooling load factors used in this method is the CLTD, or the Cooling Load Temperature Difference. This factor is used to represent the temperature difference between indoor and outdoor air with the inclusion of the heating effects of solar radiation. [1] [5] The second factor is the CLF, or the cooling load factor.
Load factor (electrical), the average power divided by the peak power over a period of time; Capacity factor, the ratio of actual energy output to the theoretical maximum possible in a power station; Passenger load factor, the ratio of revenue passenger miles to available seat miles of a particular transportation operation (e.g. a flight)
A LDC is similar to a load curve but the demand data is ordered in descending order of magnitude, rather than chronologically. The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity ...
A structural load or structural action is a mechanical load (more generally a force) applied to structural elements. [ 1 ] [ 2 ] A load causes stress , deformation , displacement or acceleration in a structure .
Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.
Load cell, a transducer that is used to create an electrical signal; Load factor (computer science), the ratio of the number of records to the number of addresses within a data structure; Load factor (electrical), the average power divided by the peak power over a period of time; Load file, the file used to import data into a database or to ...
Multiple empirical formulae exist that relate the loss factor to the load factor (Dickert et al. in 2009 listed nine [5]). Similarly, the ratio between the average and the peak current is called form coefficient k [ 6 ] or peak responsibility factor k , [ 7 ] its typical value is between 0.2 to 0.8 for distribution networks and 0.8 to 0.95 for ...