When.com Web Search

  1. Ads

    related to: pouring cement footings for decks cost

Search results

  1. Results From The WOW.Com Content Network
  2. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).

  3. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  4. Cast-in-place concrete - Wikipedia

    en.wikipedia.org/wiki/Cast-in-place_concrete

    Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]

  5. Tilt up - Wikipedia

    en.wikipedia.org/wiki/Tilt_up

    A finished tilt-up building. Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete.Though it is a cost-effective technique with a shorter completion time, [1] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.

  6. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  7. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.