When.com Web Search

  1. Ads

    related to: welded steel pipe meaning in construction engineering

Search results

  1. Results From The WOW.Com Content Network
  2. Hollow structural section - Wikipedia

    en.wikipedia.org/wiki/Hollow_structural_section

    HSS is only composed of structural steel per code. HSS is sometimes mistakenly referenced as hollow structural steel. Rectangular and square HSS are also commonly called tube steel or box section. Circular HSS are sometimes mistakenly called steel pipe, although true steel pipe is actually dimensioned and classed differently from HSS. (HSS ...

  3. List of welding codes - Wikipedia

    en.wikipedia.org/wiki/List_of_welding_codes

    Certification of companies for fusion welding of steel W47.2-11 (R2015) Certification of companies for fusion welding of aluminum W48-14: Filler metals and allied materials for metal arc welding W55.3-08 (R2013) Certification of companies for resistance welding of steel and aluminum W59-13: Welded steel construction (metal arc welding)

  4. Steel casing pipe - Wikipedia

    en.wikipedia.org/wiki/Steel_casing_pipe

    Steel casing pipe is used in different types of horizontal underground boring, where the pipe is jacked into an augered hole in segments and then connected together by welding or by threaded and coupled ends, or other proprietary pipe connectors such as interference-fit interlocking push-on joints.

  5. Piping and plumbing fitting - Wikipedia

    en.wikipedia.org/wiki/Piping_and_plumbing_fitting

    Partially-welded steel pipe joint. The welding of metals differs from soldering and brazing in that the joint is made without adding a lower-melting-point material (e.g. solder); instead, the pipe or tubing material is partially melted, and the fitting and piping are directly fused. This generally requires piping and fitting to be the same (or ...

  6. Structural steel - Wikipedia

    en.wikipedia.org/wiki/Structural_steel

    Constructability - Structural steel can be developed into nearly any shape, which are either bolted or welded together in construction. Structural steel can be erected as soon as the materials are delivered on site, whereas concrete must be cured at least 1–2 weeks after pouring before construction can continue, making steel a schedule ...

  7. Pipe (fluid conveyance) - Wikipedia

    en.wikipedia.org/wiki/Pipe_(fluid_conveyance)

    The ends of pipe to be welded must have a certain weld preparation called an End Weld Prep (EWP) which is typically at an angle of 37.5 degrees to accommodate the filler weld metal. The most common pipe thread in North America is the National Pipe Thread (NPT) or the Dryseal (NPTF) version.