Direct labour and materials are relatively easy to trace directly to products, but it is more difficult to directly allocate indirect costs to products. Where products use common resources differently, some sort of weighting is needed in the cost allocation process. The cost driver is a factor that creates or drives the cost of the activity ...
Direct labor cost is a part of wage-bill or payroll that can be specifically and consistently assigned to or associated with the manufacture of a product, a particular work order, or provision of a service. Also, we can say it is the cost of the work done by those workers who actually make the product on the production line.
In construction, the costs of materials, labor, equipment, etc., and all directly involved efforts or expenses for the cost object are direct costs. In manufacturing or other non-construction industries, the portion of operating costs that is directly assignable to a specific product or process is a direct cost. [4]
Manufacturing cost is the sum of costs of all resources consumed in the process of making a product. The manufacturing cost is classified into three categories: direct materials cost, direct labor cost and manufacturing overhead. [1] It is a factor in total delivery cost. [2]
In this method cost is absorbed as a percent of the labour cost or the wages. (Overhead cost/Labour cost)x 100 If the Labour cost is 5000 and the overhead cost is 1000 then the absorption cost is 20%. If the labour cost of one job is 500 it will have to absorb 20% i.e. 100 as the overhead cost making the total cost to be 600.
Process costing is a type of operation costing which is used to ascertain the cost of a product at each process or stage of manufacture. CIMA defines process costing as "The costing method applicable where goods or services result from a sequence of continuous or repetitive operations or processes. Costs are averaged over the units produced ...
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
In construction, the costs of materials, labor, equipment, etc., and all directly involved efforts or expenses for the cost object are direct costs. In manufacturing or other non-construction industries the portion of operating costs that is directly assignable to a specific product or process is a direct cost. [1]