Search results
Results From The WOW.Com Content Network
On 15 May 2018, the Nigerian Minister of Transportation signed a $6.68 billion contract with the China Civil Engineering Construction Corporation to complete the remaining segments of the Lagos–Kano Standard Gauge Railway. Construction is expected to take 2–3 years from the availability of funds. [20] Ibadan-Osogbo-Ilorin (200 km)
The train left Abuja's Idu station at 6 pm and was scheduled to arrive in Kaduna's Rigasa train station by 8 pm. [9] [10] According to eyewitness accounts, the train was bombed twice before the armed bandits opened fire at the passengers. [11] Sixty-two passengers were abducted in the attack. [12]
Nigerian Railway Corporation operates a network of 3,505 kilometers (2,178 mi) of single track lines 1,067 mm (3 ft 6 in) gauge, as well as 1,435 mm (4 ft 8 + 1 ⁄ 2 in) from Abuja to Kaduna. None of the NRC's lines are electrified. 157 kilometers are double-tracked.
The railway network expanded over the next few decades, and by the time Nigeria gained independence in 1960, there were over 3,000 kilometers of railway lines in the country. [2] In 2022, Nigerian Railway Corporation transported 3.21 million passengers, an increase of 18.36% from the previous year. However, revenues fell by 20% to 4.55 billion ...
In the meantime, the China Civil Engineering Construction Corporation had begun work on the Abuja–Kaduna segment of the Lagos–Kano Standard Gauge Railway in 2011. [8] Despite difficulties with theft of construction materials and land acquisition, CCECC completed the 187 km segment in 2016 as Nigeria's first standard-gauge railway. [ 9 ]
You are free: to share – to copy, distribute and transmit the work; to remix – to adapt the work; Under the following conditions: attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made.
The Ajaokuta–Kaduna–Kano Natural Gas Pipeline (AKKP) is a pipeline planned to transport natural gas from Ajaokuta, in Kogi State to Kano, in Kano State, through several states and urban centers, as part of the Trans Nigeria Gas Pipeline. [1] Construction of the AKKP commenced in July 2020. [2]
Rigasa Railway Station has a railway leading to the federal capital of Nigeria, Abuja. [ 6 ] [ 7 ] [ 8 ] In March 28, 2022, the train while departing from Rigasa Railway Station to Abuja was attacked by terrorists, kidnapping the hostages which caused a temporary closure.