When.com Web Search

  1. Ads

    related to: setting up a transit level kit

Search results

  1. Results From The WOW.Com Content Network
  2. Temporary adjustments of theodolites - Wikipedia

    en.wikipedia.org/wiki/Temporary_adjustments_of...

    The initial setting operation includes fixing the theodolite on a tripod, along with approximate levelling and centering over the station mark.For setting up the instrument, the tripod is placed over the station with its legs widely spread so that the centre of the tripod head lies above the station point and its head approximately level (by eye estimation).

  3. Level (optical instrument) - Wikipedia

    en.wikipedia.org/wiki/Level_(optical_instrument)

    The term dumpy level (also builder's level) endures despite the evolution in design. They can be manual or automatic, the latter being much quicker to set up. A tilting level is a variant which has a precision vertical adjustment screw which tilts both the telescope and the high accuracy bubble level attached to it to make them level. This ...

  4. Total station - Wikipedia

    en.wikipedia.org/wiki/Total_station

    A typical total station can measure distances up to 1,500 meters (4,900 ft) with an accuracy of about 1.5 millimeters (0.059 in) ± 2 parts per million. [ 4 ] Reflectorless total stations can measure distances to any object that is reasonably light in color, up to a few hundred meters .

  5. Surveying - Wikipedia

    en.wikipedia.org/wiki/Surveying

    The level must be horizontal to get a valid measurement. Because of this, if the horizontal crosshair of the instrument is lower than the base of the rod, the surveyor will not be able to sight the rod and get a reading. The rod can usually be raised up to 25 feet (7.6 m) high, allowing the level to be set much higher than the base of the rod.

  6. Levelling - Wikipedia

    en.wikipedia.org/wiki/Levelling

    The level must be horizontal to get a valid measurement. Because of this, if the horizontal crosshair of the instrument is lower than the base of the rod, the surveyor will not be able to sight the rod and get a reading. The rod can usually be raised up to 25 feet high, allowing the level to be set much higher than the base of the rod.

  7. Benchmark (surveying) - Wikipedia

    en.wikipedia.org/wiki/Benchmark_(surveying)

    An Ordnance Survey cut mark in the UK Occasionally a non-vertical face, and a slightly different mark, was used. The term benchmark, bench mark, or survey benchmark originates from the chiseled horizontal marks that surveyors made in stone structures, into which an angle iron could be placed to form a "bench" for a leveling rod, thus ensuring that a leveling rod could be accurately ...