Search results
Results From The WOW.Com Content Network
The China–Thailand high-speed rail link under construction, Khon Kaen, 16 May 2017. In November 2014, Thailand and China signed a memorandum of understanding agreeing to construct the Thai portion of the transnational railway running from Kunming, China to the Gulf of Thailand. In November 2015, both parties agreed to a division of labour.
This article provides a list of operational and under construction (or approved) high-speed rail networks, listed by country or region. While the International Union of Railways defines high-speed rail as public transport by rail at speeds of at least 200 km/h (124 mph) for upgraded tracks and 250 km/h (155 mph) or faster for new tracks, this article lists all the systems and lines that ...
The Don Mueang–Suvarnabhumi–U-Tapao high-speed railway, officially known as the High-Speed Rail Linking Three Airports Project (Thai: โครงการรถไฟความเร็วสูงเชื่อม 3 สนามบิน) is the second High-Speed rail line project in Thailand, being due to open in 2029 [1] between Don Mueang International Airport, Suvarnabhumi Airport ...
During its routine cabinet meeting on February 4, 2025, the Cabinet of Thailand sanctioned the second phase of the China–Thailand Railway Cooperation Project, specifically the Korat-Nong Khai segment of the Bangkok–Nong Khai high-speed train connection. The project is slated to commence in 2025 and is anticipated to conclude in 2030. [14] [15]
Thailand's first high-speed train service on the Northeastern Line, connecting Bangkok to Nong Khai, will be powered by the Fuxing Hao CR300, which is expected to arrive in 2024. [128] The service will operate on a double-track designed for high-speed travel, with an operating speed of 250 km/h.
A fourth high-speed rail project proposed by the Karnataka government would run 485 kilometres (301 mi) from Mysuru (Mysore) through Bengaluru (Bangalore) to Chennai, cutting the current nine-hour travel time to three hours (45 minutes between Mysuru and Bengaluru) at a cost of ₹ 1.15 trillion (equivalent to ₹ 1.2 trillion or US$14 billion ...
The ambitious high-speed rail project has been bogged by financial issues since it was first announced in 2013. ... (A flight between the two cities takes about an hour.) But the high-speed rail ...
Don Mueang–Suvarnabhumi–U-Tapao high-speed railway (Phaya Thai to Don Mueang section) TBA: Phaya Thai: Don Mueang: 20.31 km (12.62 mi) 2 Approved State Railway of Thailand: Rapid Transit; Sukhumvit Line: Lam Luk Ka Extension TBA: Khu Khot: Eastern Ring Road Lam Luk Ka 7.8 km (4.8 mi) 4 Postponed Mass Rapid Transit Authority of Thailand ...