Search results
Results From The WOW.Com Content Network
The China–Thailand high-speed rail link under construction, Khon Kaen, 16 May 2017. In November 2014, Thailand and China signed a memorandum of understanding agreeing to construct the Thai portion of the transnational railway running from Kunming, China to the Gulf of Thailand. In November 2015, both parties agreed to a division of labour.
During its routine cabinet meeting on February 4, 2025, the Cabinet of Thailand sanctioned the second phase of the China–Thailand Railway Cooperation Project, specifically the Korat-Nong Khai segment of the Bangkok–Nong Khai high-speed train connection. The project is slated to commence in 2025 and is anticipated to conclude in 2030. [14] [15]
The Don Mueang–Suvarnabhumi–U-Tapao high-speed railway, officially known as the High-Speed Rail Linking Three Airports Project (Thai: โครงการรถไฟความเร็วสูงเชื่อม 3 สนามบิน) is the second High-Speed rail line project in Thailand, being due to open in 2029 [1] between Don Mueang International Airport, Suvarnabhumi Airport ...
This article provides a list of operational and under construction (or approved) high-speed rail networks, listed by country or region. While the International Union of Railways defines high-speed rail as public transport by rail at speeds of at least 200 km/h (124 mph) for upgraded tracks and 250 km/h (155 mph) or faster for new tracks, this article lists all the systems and lines that ...
Don Mueang–Suvarnabhumi–U-Tapao high-speed railway (Phaya Thai to Don Mueang section) TBA: Phaya Thai: Don Mueang: 20.31 km (12.62 mi) 2 Approved State Railway of Thailand: Rapid Transit; Sukhumvit Line: Lam Luk Ka Extension TBA: Khu Khot: Eastern Ring Road Lam Luk Ka 7.8 km (4.8 mi) 4 Postponed Mass Rapid Transit Authority of Thailand ...
High-speed rail: State Railway of Thailand: Declared 1.3712 km 2 (0.5294 sq mi) Eastern high-speed railway: Bangkok, Samut Prakan, Chachoengsao, Chonburi, and Rayong [35] EECi: Aripolis, and Biopolis National Science and Technology Development Agency: Declared 5.6 km 2 (2.2 sq mi) Wang Chan Valley Rayong [36] [37] EECmd: Comprehensive healthcare
A fourth high-speed rail project proposed by the Karnataka government would run 485 kilometres (301 mi) from Mysuru (Mysore) through Bengaluru (Bangalore) to Chennai, cutting the current nine-hour travel time to three hours (45 minutes between Mysuru and Bengaluru) at a cost of ₹ 1.15 trillion (equivalent to ₹ 1.2 trillion or US$14 billion ...
The station has 24 platforms, including 10 for high-speed rail, 2 for the Airport Rail Link, 8 for inter-city rail, and 4 for Red Lines. It is also linked to the Blue Line [ 131 ] To further improve the station's accessibility and convenience for all passengers, including those with disabilities and the elderly, a double-track railway project ...