When.com Web Search

  1. Ads

    related to: quikrete fast setting repair mortar concrete calculator chart

Search results

  1. Results From The WOW.Com Content Network
  2. Cement accelerator - Wikipedia

    en.wikipedia.org/wiki/Cement_accelerator

    A cement accelerator is an admixture for the use in concrete, mortar, rendering or screeds. The addition of an accelerator speeds the setting time and thus cure time starts earlier. [ 1 ] This allows concrete to be placed in winter with reduced risk of frost damage. [ 2 ]

  3. Concrete pavement restoration - Wikipedia

    en.wikipedia.org/wiki/Concrete_Pavement_Restoration

    CPP and CPR methods, developed over the last 40 years, are used in lieu of asphalt overlays and bituminous patches to repair roads when longer lasting solutions are desired. When installing pavers over top of an existing asphalt of concrete pad, there are three installation options: sand set, bituminous set, and mortar set. [1]

  4. Concrete - Wikipedia

    en.wikipedia.org/wiki/Concrete

    A single concrete block, as used for construction. Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. . Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material

  5. Ready-mix concrete - Wikipedia

    en.wikipedia.org/wiki/Ready-mix_concrete

    Concrete has a limited lifespan between batching / mixing and curing. This means that ready-mixed concrete should be placed within 30 to 45 minutes of the batching process to hold slump and mix design specifications in the US, [15] though in the UK, environmental and material factors, plus in-transit mixing, allow for up two hours to elapse. [16]

  6. Shotcrete - Wikipedia

    en.wikipedia.org/wiki/Shotcrete

    Shotcrete, gunite (/ ˈ ɡ ʌ n aɪ t /), or sprayed concrete is concrete or mortar conveyed through a hose and pneumatically projected at high velocity onto a surface. This construction technique was invented by Carl Akeley and first used in 1907.

  7. Repointing - Wikipedia

    en.wikipedia.org/wiki/Repointing

    High-lime mortar dries rapidly, so after it reaches a particular strength it needs to be sprayed with water to avoid chalking, poor adhesion, or poor durability. The structure is misted every two hours for two days, then every four hours for two days. [2] It is important that the mortar stays wet for at least a couple of days while it is setting.