The North–South Commuter Railway will comprise two sections corresponding to the Philippine National Railways' old main lines. The first is the 91-kilometer (57-mile) [123] fully-elevated PNR Clark which is being built over the mostly-defunct North Main Line in northern Metro Manila and Central Luzon.
Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas.The railway network, collectively known as the Greater Capital Region Railway System, [3] [4] [5] consists of the Manila Light Rail Transit System (LRT), Manila Metro Rail Transit System (MRT), and Philippine National Railways lines within the region.
The Philippine Railway Company, along with operating the Panay line, operated a line in Cebu from 1911 to 1942, when operations ceased because of the Japanese occupation of the Philippines during World War II. [51] The line ran from Danao south through Cebu City to Argao. [52] The line was built by the related Philippine Railways Construction ...
Mindanao Railway (Phase 1) Proposed MRT Line 3 Rehabilitation Project (Phase 2) Proposed MRT Line 3 South Extension Project Proposed MRT Line 4: Proposed MRT Line 7: 2016– Under-construction 2025 North–South Commuter Railway: 2019– Under-construction 2025 (Phase 1), 2027 (Phase 2), 2029 (Phase 3) PNR South Long Haul: Proposed 2025 Subic ...
In the early 2000s, the Mindanao Strategic Railway Development Plan was formulated. The planned railway, with a total length of 1,533 km (953 mi), was designed to span the entire island in a loop and was estimated to cost ₱66.5 billion. The plan for a railway divided into four phases: [20] Laguindingan to Cagayan de Oro, Cagayan de Oro to ...
The PNR South Long Haul, also known as the PNR Bicol, was a proposed inter-city rail line project in southern Luzon, Philippines. [1] It is part of the larger Luzon Rail System, [2] a network of long-distance standard-gauge lines being built by the Philippine National Railways throughout Luzon.
The Metro Manila Dream Plan, formally titled the Roadmap for Transport Infrastructure Development for Metro Manila and Its Surrounding Areas, [1] [2] refers to a 2014 integrated plan for improving the transport system [3] [4] in Metro Manila, Philippines, with the hope of turning it into a focal point for addressing Metro Manila's interlinked problems in the areas of transportation, land use ...
The North–South Commuter Railway is an under-construction commuter rail from New Clark City in Capas, Tarlac to Calamba, Laguna. The North Line will have a length of 106-kilometer, from Tutuban in Manila to New Clark City, and is expected to be completed by 2021.