Search results
Results From The WOW.Com Content Network
Tasmania's Gordon Dam, one of the largest in Australia, was constructed in the 1970s. It has a catchment area of 1,280 km2 (494 sq mi). It has a catchment area of 1,280 km2 (494 sq mi). Dams and reservoirs in Australia is a link page for any dam or reservoir in Australia.
Brisbane combined Dam levels. Brisbane water levels reduced to under 20% of capacity, having had no substantial inflow for five years. [49] Brisbane organised to be supplied via larger dams, a pipeline and possibly also recycling. The Gold Coast Desalination Plant was constructed at Bilinga, delivering water from 2009. [50]
The dam wall is located about 80 kilometres (50 mi) by road from the centre of Brisbane. The primary purpose of the dam is the supply of potable water for the Brisbane and Ipswich regions. South-east Queensland's largest dam also provides for flood mitigation control, hydroelectricity, and recreation. [1]
The Gold Creek Dam is located on the edge of Brisbane Forest Park, 14 kilometres (8.7 mi) west of Brisbane, on the Gold Creek, a tributary of Moggill Creek, to augment supplies from the recently completed Enoggera Dam. Unlike Enoggera, the Gold Creek site could supply water to the most elevated parts of the city.
The North Pine Dam was designed by the Department of Local Government, with the Co-ordinator General's Department supervising construction contracts headed by Transfield. The cost of the dam was A$ 20 million, [3] and the dam was opened on 12 August 1976 by the Lord Mayor of Brisbane City Council, Alderman Frank Sleeman.
The Lake Manchester Dam Flood Security Upgrade was a Brisbane City Council project to ensure that the dam met the Australian National Committee on Large Dams (ANCOLD) guidelines for large dams. [7] The project involved strengthening and raising the dam wall for flood security purposes. Work began in early 2007 [7] and was completed in 2008. [2]
The Enoggera Dam was constructed in 1866, on the upper reach of Breakfast Creek (which section was later renamed Enoggera Creek).It was the first major dam built in Queensland and the second major dam built in Australia (the first major dam, Yan Yean Reservoir having been built in Victoria in 1850). [2]
The dam reached a level of 98.8% in March 1991, and finally overflowed for the first time in December 2010. It reached its highest level of 1.48m above the spillway in March 2011. The dam overflowed again in March 2012, and March 2013. The dam reached its lowest level of 10.7% in 2007. [4] [5]