Standard time is the amount of time that should be allowed for an average worker to process one work unit using the standard method and working at a normal pace. The standard time includes some additional time, called the contingency allowance, to provide for the worker's personal needs, fatigue, and unavoidable delays during the shift.
In manufacturing, the purpose of scheduling is to keep due dates of customers and then minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation, utilize maximum resources available and reduce costs.
In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to cover contingent elements which may ...
Manufacturing process management (MPM) is a collection of technologies and methods used to define how products are to be manufactured. MPM differs from ERP/MRP which is used to plan the ordering of materials and other resources, set manufacturing schedules, and compile cost data.
Production planning is the future of production. It can help in efficient manufacturing or setting up of a production site by facilitating required needs. [2] A production plan is made periodically for a specific time period, called the planning horizon. It can comprise the following activities:
A typical FMS system. A flexible manufacturing system (FMS) is a manufacturing system in which there is some amount of flexibility that allows the system to react to changes, whether predicted or unpredicted. This flexibility is generally considered to fall into two categories, both of which have numerous subcategories.
Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.
A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. [1] It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded. [2]