The last are used in concrete-steel composite structures as shear connectors. [6] Other uses include anchoring machines to poured concrete floors [7] and buildings to their concrete foundations. Various typically disposable aids, mainly of plastic, are produced to secure and align cast-in-place anchors prior to concrete placement.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The channels are supplied with foam filler to prevent concrete from leaking into the channel when the concrete is poured. The system includes T-shaped bolts which are called T-bolts or channel bolts in the regulations. They are also called hammer head bolts, serrated bolts or hook-headed bolts based on their shape and function. The T-bolts are ...
After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.
Helical anchors consist of an extendable steel shaft with helical bearing plates. Piles or piers refer to strong base elements that withstand or transfer vertical/horizontal loads. Anchors are piles utilised only in tension applications like restraining wall tiebacks or vertical ground anchors made to resist overturning forces.
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]