When.com Web Search

  1. Ads

    related to: how to test mgb alternator ground power unit adalah dan contoh data kualitatif

Search results

  1. Results From The WOW.Com Content Network
  2. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  3. Device under test - Wikipedia

    en.wikipedia.org/wiki/Device_under_test

    In semiconductor testing, the device under test is a die on a wafer or the resulting packaged part. A connection system is used, connecting the part to automatic or manual test equipment. The test equipment then applies power to the part, supplies stimulus signals, then measures and evaluates the resulting outputs from the device.

  4. Ground loop (electricity) - Wikipedia

    en.wikipedia.org/wiki/Ground_loop_(electricity)

    The ground loop still exists, but the two sides of the loop are close together, so stray magnetic fields induce equal currents in both sides, which cancel out. Break in the shield Create a break in the signal cable shield conductor. [5] The break should be at the load end. This is often called ground lifting. It is the simplest solution; it ...

  5. Synchronization (alternating current) - Wikipedia

    en.wikipedia.org/wiki/Synchronization...

    In an alternating current (AC) electric power system, synchronization is the process of matching the frequency, phase and voltage of a generator or other source to an electrical grid in order to transfer power. If two unconnected segments of a grid are to be connected to each other, they cannot safely exchange AC power until they are synchronized.

  6. ADF-GLS test - Wikipedia

    en.wikipedia.org/wiki/ADF-GLS_test

    This is a point optimal test for which ¯ is set in such a way that the test would have a 50 percent power when the alternative is characterized by = / for = ¯. Depending on the specification of d t {\displaystyle d_{t}\,} , c ¯ {\displaystyle {\bar {c}}\,} will take different values.

  7. Ground support equipment - Wikipedia

    en.wikipedia.org/wiki/Ground_support_equipment

    Ground power unit that needs towing. A ground power unit (GPU) is a vehicle capable of supplying power to aircraft parked on the ground. [2] Ground power units may also be built into the jetway, making it even easier to supply electrical power to aircraft.

  8. Ground continuity monitor - Wikipedia

    en.wikipedia.org/wiki/Ground_continuity_monitor

    A GCM or ground continuity monitor (also called a ground integrity monitor or ground continuity tester) is an electrical safety device that monitors the impedance to ground of a temporary electrical circuit and can provide indication (or protective trip) in the event impedance rises to an unsafe value. A GCM is either an external testing device ...

  9. FADEC - Wikipedia

    en.wikipedia.org/wiki/FADEC

    A full authority digital engine (or electronics) control (FADEC) is a system consisting of a digital computer, called an "electronic engine controller" (EEC) or "engine control unit" (ECU), and its related accessories that control all aspects of aircraft engine performance.