Steel joists and Joist Girders being erected. In structural engineering , the open web steel joist (OWSJ) is a lightweight steel truss consisting, in the standard form, of parallel chords and a triangulated web system, proportioned to span between bearing points.
Joists can also be joined by being slipped into mortises after the beams are in place such as a chase mortise (pulley mortise), L-mortise, or "short joist". Also, in some Dutch-American work, ground level joists are placed on a foundation and then a sill placed on top of the joists such as what timber frame builder Jack Sobon called an ...
A girder (/ ˈ ɡ ɜːr d ər /) is a beam used in construction. [1] It is the main horizontal support of a structure which supports smaller beams. Girders often have an I-beam cross section composed of two load-bearing flanges separated by a stabilizing web, but may also have a box shape, Z shape, or other forms. Girders are commonly used to ...
In flooring construction, the rim joists sit on the sill plates; in deck construction, they are parallel to the support beams and sit on the beams or in some cases, cantilever away from the beams. A double thickness board in the position of a rim joist is called a flush beam and serves a dual purpose, providing primary support for the joist ...
I-beams are commonly made of structural steel but may also be formed from aluminium or other materials. A common type of I-beam is the rolled steel joist (RSJ), sometimes incorrectly rendered as reinforced steel joist. British and European standards also specify Universal Beams (UBs) and
The two common assumptions as to the behavior of a building frame are (1) that its beams are free to rotate at their connections or (2) that its members are so connected that the angles they make with each other do not change under load. Frameworks with connections of intermediate stiffness will be intermediate between these two extremes.
Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a
The joists are eliminated by the use of heavy planks saving time and strength of the timbers because the joists notches were eliminated. The beams are spaced 4 feet (1.2 m) to 18 feet (5.5 m) apart and the planks are 2 inches (5.1 cm) or more thick possibly with another layer of 1 inch (2.5 cm) on the top as the finished flooring could span ...