Ads
related to: steel shutters for concrete floorsarchitecturaldepot.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
Steel shutters can close this through a system of chains. Each steel shutter weighed one-half a ton. It was written that the gearing used to open the doors were so easy a child of six could do it. [2] The office segment is to the west. The first floor segment is 15 by 15 feet (4.6 by 4.6 m) with two double-hung windows on both the south and ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
A pile cap is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation. It usually forms part of the deep foundation of a building, typically a multi-story building, structure or support base for heavy equipment, or of a bridge.
A concrete spacer with a plastic clip in use Concrete spacers in a precast element Diaphragm wall block on rebar for a Diaphragm wall. A rebar spacer is a short, rod-like device used to secure reinforcing steel bars, or rebar, within cast assemblies for reinforced concrete structures. The rebar spacers are fixed before the concrete is poured ...
The central "web" of the steel I-beam is often wider than a column web to resist the higher bending moments that occur in beams. Wide sheets of steel deck can be used to cover the top of the steel frame as a "form" or corrugated mold, below a thick layer of concrete and steel reinforcing bars. Another popular alternative is a floor of precast ...
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]