The vessel is equipped with two revolving cranes built by Huisman Equipment B.V., each with a capacity of 10,000 t (11,000 short tons); the main cranes can be operated in tandem to jointly lift 20,000 t (22,000 short tons). After its completion in 2019, SSCV Sleipnir succeeded Heerema's earlier SSCV Thialf as the largest crane vessel in the world.
The Saipem 7000 has completed 4 J-Lay pipe projects Diana, Blue Stream, Ormen Lange and Medgaz, but its main work continues to be heavy lift in the North Sea and the Gulf of Mexico. This includes both platform installation and removal and the addition of modules to existing platforms.
In 1978, HMC commissioned Mitsui to construct the two sister semi-submersible crane vessels, DCV Balder and SSCV Hermod. These vessels could lift 5,400 tonnes with the twin cranes, and were later upgraded to 8,200 tonnes. [2] In 1988 HMC formed a joint venture with McDermott called HeereMac. [3] "Thialf" in a Norway fjord
The main hoist could lift 92 m (302 ft) above the work deck. The auxiliary hoists could lower to a depth of 3,000 metres (9,800 ft) below the work deck. A tandem lift using the main hoists could lift 9,000 short tons (8,200 t) at a 39 m (128 ft) radius.
During transit an SSCV is de-ballasted to a draught where only part of the lower hull is submerged. During lifting operations, the vessel is ballasted down. This way, the lower hull is well submerged. This reduces the effect of waves and swell. High stability is obtained by placing the columns far apart. The high stability allows them to lift ...
SSCV Thialf is a huge semi-submersible crane vessel operated by the Netherlands-based Heerema Marine Contractors; it was the largest crane vessel in the world until the SSCV Sleipnir became the largest in 2019.
The original hoist contained components mated together in what is now called the built-up style hoist. These built up hoists are used for heavy-duty applications such as steel coil handling and for users desiring long life and better durability. They also provide for easier maintenance.
In 1978 Occidental’s Piper Alpha was the first platform installation with a Semi Submersible Crane Vessel. It was a British platform that blew out and burned to the water, killing 167 of its crew. It was a British platform that blew out and burned to the water, killing 167 of its crew.