Search results
Results From The WOW.Com Content Network
Line-of-balance; Flowline or flow line; Repetitive scheduling method; Vertical production method; Time-location matrix model; Time space scheduling method; Disturbance scheduling; Horizontal and vertical logic scheduling for multistory projects; Horizontal and vertical scheduling; Multiple repetitive construction process; Representing ...
Uneven production process in simulation inside production simulation game in Ford's Museum. Production leveling, also known as production smoothing or – by its Japanese original term – heijunka (平準化), [1] is a technique for reducing the mura (unevenness) which in turn reduces muda (waste).
These four readings are sufficient to define the size and position of a final mass to achieve good balance. Ref 4 For production balancing, the phase of dynamic vibration is observed with its amplitude. This allows one-shot dynamic balance to be achieved with a single spin, by adding a mass of internally calculated size in a calculated position.
A signal transmitted over a balanced line. The signal is kept intact while the noise (which appears as a common-mode signal at the receiving end) is rejected perfectly.. In telecommunications and professional audio, a balanced line or balanced signal pair is an electrical circuit consisting of two conductors of the same type, both of which have equal impedances along their lengths, to ground ...
Linear multistep methods are used for the numerical solution of ordinary differential equations. Conceptually, a numerical method starts from an initial point and then takes a short step forward in time to find the next solution point. The process continues with subsequent steps to map out the solution.
A drainage equation is an equation describing the relation between depth and spacing of parallel subsurface drains, depth of the watertable, depth and hydraulic conductivity of the soils. It is used in drainage design. Parameters in Hooghoudt's drainage equation. A well known steady-state drainage
From this energy balance, it is clear that NTU relates the temperature change of the flow with the minimum heat capacitance rate to the log mean temperature difference (). Starting from the differential equations that describe heat transfer, several "simple" correlations between effectiveness and NTU can be made. [ 2 ]
Within the branch of materials science known as material failure theory, the Goodman relation (also called a Goodman diagram, a Goodman-Haigh diagram, a Haigh diagram or a Haigh-Soderberg diagram) is an equation used to quantify the interaction of mean and alternating stresses on the fatigue life of a material. [1]