Ads
related to: how to run pipe under concrete slab door video system
Search results
Results From The WOW.Com Content Network
Riser Clamp holding plastic pipe, penetrating through a concrete floor slab. The copper pipe penetration is firestopped with firestop mortar. Riser clamp for a standpipe through-penetration firestop inside a fire hose cabinet under construction
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Trap with copper drain pipe at underside of firestop packing in two-hour fire-resistance rated concrete floor slab Typical P-trap. Maintaining the water seal is critical to trap operation; traps might dry out, and poor venting can suction or blow water out of the traps. This is usually avoided by venting the drain pipes downstream of the trap ...
Attaching the drainage pipes to the suspended form; Filling the trench with concrete (surrounding the form base and sides) and finishing the concrete flush with the metal frame; And after drying, removing the wooden form, cleaning the pipe inverts and placing the grates in the frame. This installation method is by far the most labor-intensive.
The multiple pipes were then sealed together with hot animal fat. Wooden pipes were used in Philadelphia, [24] Boston, and Montreal in the 1800s. Built-up wooden tubes were widely used in the US during the 20th century. These pipes (used in place of corrugated iron or reinforced concrete pipes) were made of sections cut from short lengths of wood.
Even if you haven't run your faucet in days, there's still a small amount of sitting water in your pipes. Water expands when it's frozen, which poses a danger to your pipes (which don't fluctuate ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
For example, a 4" pipe, with 1" of thermal insulation makes a 6" penetrant (1" pipe covering on each side of the pipe), plus two pipe sizes = an 8" sleeve, creating a 1" annulus. In case of insulated piping, the size of the insulation must be taken into account for the intended firestop certification listing .