Design–build (or design/build, and abbreviated D–B or D/B accordingly), also known as alternative delivery, [1] is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build ...
Design–build–finance–operate-maintain (DBFOM) [10] [11] also referred to as Design–build–finance–maintain-operate (DBFMO) [12] [13] is a project delivery method very similar to BOOT except that there is no actual ownership transfer. Moreover, the contractor assumes the risk of financing until the end of the contract period.
With the traditional design–bid–build process, a complete set of construction documents and specifications describes what the builder agrees to build and serves as the heart of the contract. On Fast-track projects, the design, construction documents and specifications are incomplete, so setting the final cost presents problems.
If speed is important, design and construction contracts can be awarded separately; bidding takes place on preliminary plans in a not-to-exceed contract instead of a single firm design-build contract. The major problem [11] with design-build contracts is an inherent conflict of interest. In a standard contract the architect works for the owner ...
Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.
A planned unit development (PUD) is a type of flexible, non-Euclidean zoning device that redefines the land uses allowed within a stated land area. PUDs consist of unitary site plans that promote the creation of open spaces, mixed-use housing and land uses, environmental preservation and sustainability, and development flexibility. [ 1 ]
The construction industry has suffered from a productivity decline since the 1960s [4] [5] while all other non-farm industries have seen large boosts in productivity. . Proponents of Integrated project delivery argue that problems in contemporary construction, such as buildings that are behind schedule and over budget, are due to adverse relations between the owner, general contractor, and
CDM Smith Inc. is an American engineering and construction company headquartered in Boston, Massachusetts. CDM Smith offers services in water, environment, transportation, and energy and facilities projects for public and private clients. [2]