Ad
related to: schematics of a leach field construction costs based on total maintenance
Search results
Results From The WOW.Com Content Network
A septic drain field, a septic tank, and associated piping compose a septic system. The drain field typically consists of an arrangement of trenches containing perforated pipes and porous material (often gravel) covered by a layer of soil to prevent animals (and surface runoff) from reaching the wastewater distributed within those trenches. [1]
Unlike the traditional septic system, the aerobic treatment system produces a high quality secondary effluent, which can be sterilized and used for surface irrigation. This allows much greater flexibility in the placement of the leach field, as well as cutting the required size of the leach field by as much as half. [1]
For a complex engineering system containing thousands of assemblies, sub-assemblies, components, organized into several levels of indenture and with a number of possible repair decisions, LORA seeks to determine an optimal provision of repair and maintenance facilities to minimize overall system life-cycle costs.
The primary disadvantage associated with the two stage drainage ditch is the upfront cost of the earthwork necessary to increase the existing channel for the benches to be constructed. Construction costs for such earthwork are contingent upon the watershed size and depth of the ditch and approximately range from $5–20 USD/linear foot. [6]
Mound systems are an alternative to the traditional rural septic system drain field. They are used in areas where septic systems are prone to failure from extremely permeable or impermeable soils, soil with the shallow cover over porous bedrock, and terrain that features a high water table.
The decision to build a combined sewer system or two separate systems is mainly based on the need for sewage treatment and the cost of providing treatment during heavy rain events. Many cities with combined sewer systems built their systems prior to installing sewage treatment plants, and have not subsequently replaced those sewer systems. [2]
Construction cost management is a fee-based service in which the construction manager (CM) is responsible exclusively to the owner, acting in the owner's interests at every stage of the project. The construction manager offers impartial advice on matters such as: Optimum use of available funds; Control of the scope of the work; Project scheduling
If there is a suitable septic tank in place, pumping the effluent from the tank is the lowest cost option for initial costs. Whether the septic tank is the lowest cost option over time depends on the cost of electricity in the area, how often the tank must be emptied and how much it costs to have the solids pumped out of the tank.