When.com Web Search

  1. Ads

    related to: messko mto oil level control module

Search results

  1. Results From The WOW.Com Content Network
  2. Material take off - Wikipedia

    en.wikipedia.org/wiki/Material_take_off

    A material take off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. Thereafter, the material take off is used to create a bill of materials (BOM). Procurement and requisition are activities that occur after the bill of materials is complete, distinct from Inspection.

  3. Buchholz relay - Wikipedia

    en.wikipedia.org/wiki/Buchholz_relay

    Buchholz relays have a test port to allow the accumulated gas to be withdrawn for testing. Flammable gas found in the relay indicates some internal fault such as overheating or arcing, whereas air found in the relay may only indicate low oil level or a leak. [3] Through a connected gas sampling device the control can also be made from the ground.

  4. List of abbreviations in oil and gas exploration and production

    en.wikipedia.org/wiki/List_of_abbreviations_in...

    LCR – local control room; LCV – level control valve; L/D – lay down (such as tubing or rods) LD – lay down (such as tubing or rods) LDAR – leak detection and repair; LDHI – low-dosage hydrate inhibitor; LDL – litho density log; LDS – leak detection system (pipeline monitoring) LDTEP – LDT EPT gamma ray log; LEAKL – leak ...

  5. Floating production storage and offloading - Wikipedia

    en.wikipedia.org/wiki/Floating_production...

    Originally, all oil platforms sat on the seabed, but as exploration moved to deeper waters and more distant locations in the 1970s, floating production systems came to be used. [5] The first oil FPSO was built in 1977 on the Shell Castellon field, located in the Spanish Mediterranean. [6] Today, over 270 vessels are deployed worldwide as oil ...

  6. Universal Master Control Station - Wikipedia

    en.wikipedia.org/wiki/Universal_Master_Control...

    A typical Master Control Station. On the top-side facilities of offshore oil and gas platforms, the Master Control Station (MCS) is a dedicated system that controls and retrieves data from subsea equipment on the ocean floor. The MCS is supplied by the manufacturers of the subsea control modules (SCM), an MCS is required for each vendor.

  7. Mesko - Wikipedia

    en.wikipedia.org/wiki/Mesko

    Mesko is a Polish defense technology company established in 1922, operating from August 25, 1924 as Państwowa Fabryka Amunicji (National Ammunition Factory), then Zakłady Metalowe MESKO SA (Metal Factory MESKO SA).

  8. Level sensor - Wikipedia

    en.wikipedia.org/wiki/Level_sensor

    Point level sensing of adhesives and high-viscosity materials such as oil and grease can result in the build-up of material on the probe; however, this can be minimized by using a self-tuning sensor. For liquids prone to foaming and applications prone to splashing or turbulence, capacitance level sensors can be designed with splashguards or ...

  9. Level control valve - Wikipedia

    en.wikipedia.org/wiki/Level_control_valve

    A level control valve or altitude control valve is a type of valve that automatically responds to changes in the height of a liquid in some storage system. A common example is the set of ballcocks in a flush toilet, where each stage of the flush cycle is actuated by the emptying or filling of the tank.