When.com Web Search

  1. Ads

    related to: 900mm postform tops clearance

Search results

  1. Results From The WOW.Com Content Network
  2. Loading gauge - Wikipedia

    en.wikipedia.org/wiki/Loading_gauge

    The clearance space between a train and the tunnel is often small. Pictured is a London Underground Northern line 1995 Stock train emerging from the tunnel north of Hendon Central station . A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads.

  3. Countertop - Wikipedia

    en.wikipedia.org/wiki/Countertop

    Once manufactured the tops need only to be cut to length, mitered, fitted for assembly, and end capped (only if it is a visible finished end). A very specific machine for cutting the postform countertop is manufactured by only a few companies, it is commonly called a Cutting Station, Top Saw, or simply Miter Saw. This machine accurately cuts ...

  4. Structure gauge - Wikipedia

    en.wikipedia.org/wiki/Structure_gauge

    Eurocode 1: Actions on structures has a definition of "physical clearance" between roadway surface and the underside of bridge element. The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in). [2]

  5. Clearance (civil engineering) - Wikipedia

    en.wikipedia.org/wiki/Clearance_(civil_engineering)

    In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.

  6. 900 mm gauge railways - Wikipedia

    en.wikipedia.org/wiki/900_mm_gauge_railways

    Country/territory Railway Australia: Yallourn 900 mm railway (defunct) [1]; Austria: Linz urban tramways . Florianerbahn [2]; Pöstlingbergbahn (converted in 2009 from 1,000 mm or 3 ft 3 + 3 ⁄ 8 in metre gauge) [3]

  7. British Rail locomotive and multiple unit numbering and ...

    en.wikipedia.org/wiki/British_Rail_locomotive...

    From late 1970, British Rail started to apply new numbers to locomotives and multiple units based on the TOPS classification system, the first classes to be dealt with being the LNER-design EM1 type (TOPS class 76) and the AL3 and AL4 types of AC electric locomotives (TOPS classes 83 and 84). The format of these numbers is xxxyyy, where xxx is ...