Ads
related to: flat plate floor system designhouzz.com has been visited by 10K+ users in the past month
smartdraw.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
The waffle slab floor system has several advantages: Better for buildings that require less vibrations – this is managed by the two way joist reinforcements that form the grid. Bigger spans can be achieved with less material, being more economical and environmentally friendly; Some people find the waffle pattern aesthetically pleasing [4]
Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
Another fabrication system produces hollow-core floor slabs in reinforced concrete (not prestressed). These are made on carousel production lines, directly to exact length, and as a stock product. However, the length is limited to about 7-8 meters. Especially in Belgium, this method is widely used in private housing.
The floor systems are mostly built from pre-topped double tees. This system evolved from the earlier use of tee systems where the flanges of the T-beams were connected. The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping.