When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. ITER Neutral Beam Test Facility - Wikipedia

    en.wikipedia.org/wiki/ITER_Neutral_Beam_Test...

    To deliver power to the fusion plasma in ITER, two heating neutral beam injectors will be installed. They are designed to provide the power of 17 MW each, through the 23 m beamlines, up to the four-meter diameter container: in order to deposit sufficient heating power in the plasma core instead of the plasma edges, the beam particle energy shall be about 1 MeV, thus increasing the neutral beam ...

  3. Two-tone testing - Wikipedia

    en.wikipedia.org/wiki/Two-tone_testing

    Circuit components such as amplifiers can be tested using the two-tone method with a test setup like that shown in the figure. Two signal generators, set to two different frequencies F1 and F2, are fed into a power combiner through circulators. The combiner needs to have good isolation to prevent the signal from one generator being sent to the ...

  4. Split-phase electric power - Wikipedia

    en.wikipedia.org/wiki/Split-phase_electric_power

    This three-wire single-phase system is common in North America for residential and light commercial applications. Circuit breaker panels typically have two live (hot) wires, and a neutral, connected at one point to the grounded center tap of a local transformer. Usually, one of the live wires is black and the other one red; the neutral wire is ...

  5. Single-wire earth return - Wikipedia

    en.wikipedia.org/wiki/Single-wire_earth_return

    Single-wire earth return (SWER) or single-wire ground return is a single-wire transmission line which supplies single-phase electric power from an electrical grid to remote areas at lowest cost. The earth (or sometimes a body of water) is used as the return path for the current, to avoid the need for a second wire (or neutral wire ) to act as a ...

  6. Single-ended signaling - Wikipedia

    en.wikipedia.org/wiki/Single-ended_signaling

    If there are n signals, then there are n+1 wires, one for each signal and one for ground, while differential signaling uses at least 2n wires. A disadvantage of single-ended systems that utilize a common return is that the return currents for all the signals use the same conductor (even if separate ground wires are used, the grounds are ...

  7. Copper cable certification - Wikipedia

    en.wikipedia.org/wiki/Copper_cable_certification

    The delay skew test is used to find the difference in propagation delay between the fastest and slowest set of wire pairs. An ideal skew is between 25 and 50 nanoseconds over a 100-meter cable. The lower this skew the better; less than 25 ns is excellent, but 45 to 50 ns is marginal.

  8. Four-terminal sensing - Wikipedia

    en.wikipedia.org/wiki/Four-terminal_sensing

    Four-point measurement of resistance between voltage sense connections 2 and 3. Current is supplied via force connections 1 and 4. In electrical engineering, four-terminal sensing (4T sensing), 4-wire sensing, or 4-point probes method is an electrical impedance measuring technique that uses separate pairs of current-carrying and voltage-sensing electrodes to make more accurate measurements ...

  9. Current clamp - Wikipedia

    en.wikipedia.org/wiki/Current_clamp

    A relatively recent development is a multi-conductor clamp meter with several sensor coils around the jaws of the clamp. This could be clamped around standard two- or three-conductor single-phase cables to provide a readout of the current flowing through the load, [3] with no need to separate the conductors.