Search results
Results From The WOW.Com Content Network
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
The first nine blocks in the solution to the single-wide block-stacking problem with the overhangs indicated. In statics, the block-stacking problem (sometimes known as The Leaning Tower of Lire (Johnson 1955), also the book-stacking problem, or a number of other similar terms) is a puzzle concerning the stacking of blocks at the edge of a table.
Verify in field is a construction document notation indicating that the dimensions on a drawing (including architectural, structural, plumbing, mechanical, and electrical plans or miscellaneous vendor shop drawings) require additional verification on the actual site or field. This is commonly shown on drawings as "VIF".
(Greek: ὀρθοστάτης, standing upright) The Greek term for the lowest course of masonry of the external walls of the naos or cella, consisting of vertical slabs of stone or marble equal in height to two or three of the horizontal courses which constitute the inner part of the wall. [68] Orthostyle
An alternative raised floor application with disposable formworks from job site in Turkey A suction-cup tile lifter has been used to remove a tile.. A raised floor (also raised flooring, access floor(ing), or raised-access computer floor) provides an elevated structural floor above a solid substrate (often a concrete slab) to create a hidden void for the passage of mechanical and electrical ...
Overhang on 16th century Tomb of Salim Chishti, Fatehpur Sikri, India In architecture , an overhang is a protruding structure that may provide protection for lower levels. Overhangs on two sides of Pennsylvania Dutch barns protect doors, windows, and other lower-level structures.
The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. [1] The shop drawing normally shows more detail than the construction documents.
The wall itself has a height of 15000 mm and consists of two lanes, each 3000 mm wide, with a distance of 0 to 1000 mm from each other. The wall stands on a 200 mm socle and must continue 500 mm above the finish button, i.e. above the 15 m. The wall must overhang continuously with an angle of 5°.