According to SAP, PI reduces the TCO by providing a common repository for interfaces. The central component of SAP PI is the SAP Integration Server, which facilitates interaction between diverse operating systems and applications across internal and external networked computer systems. PI is built upon the SAP Web Application Server.
Test coverage in the test plan states what requirements will be verified during what stages of the product life. Test coverage is derived from design specifications and other requirements, such as safety standards or regulatory codes, where each requirement or specification of the design ideally will have one or more corresponding means of verification.
The test strategy describes the test level to be performed. There are primarily three levels of testing: unit testing, integration testing, and system testing. In most software development organizations, the developers are responsible for unit testing. Individual testers or test teams are responsible for integration and system testing.
SAP S/4HANA is an enterprise resource planning (ERP) software package meant to cover all day-to-day processes of an enterprise (for example, order-to-cash, procure-to-pay, plan-to-product, and request-to-service) and core capabilities. [1]
The Test and Evaluation Master Plan documents the overall structure and objectives of the Test & Evaluation for a program. [3] It covers activities over a program’s life-cycle and identifies evaluation criteria for the testers. [4] The test and evaluation master plan consists of individual tests. Each test contains the following. Test Scenario
The project initiation documentation is a PRINCE2 [1] term representing the plan of approach in project management. It is assembled from a series of other documents, including the business case, the terms of reference, the communication plan, the risk register, the project tolerances, the project plan, and any specific project controls or inspections as part of a departmental quality plan or ...
An executable test suite must work on a sufficiently detailed level to correctly communicate with the SUT and a test harness is usually present to interface the executable test suite with the SUT. A test suite for a primality testing subroutine might consist of a list of numbers and their primality (prime or composite), along with a testing ...
Level Test Design (LTD): Detailing test cases and the expected results as well as test pass criteria. Level Test Case (LTC): Specifying the test data for use in running the test cases identified in the Level Test Design. Level Test Procedure (LTPr): Detailing how to run each test, including any set-up preconditions and the steps that need to be ...