When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Shop drawing - Wikipedia

    en.wikipedia.org/wiki/Shop_drawing

    Shop drawings are produced by contractors and suppliers under their contract with the owner. The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. [1] The shop drawing normally shows more detail than the construction documents.

  3. Submittals (construction) - Wikipedia

    en.wikipedia.org/wiki/Submittals_(construction)

    The submittal process requires lead-time consideration to produce the submittal, shop drawing (engineering), review and revise and the shop fabrication period. Careful planning is necessary to ensure that the products are ordered and delivered within the construction schedule, so as not to delay any activities.

  4. Category:Construction documents - Wikipedia

    en.wikipedia.org/wiki/Category:Construction...

    Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Help; Learn to edit; Community portal; Recent changes; Upload file

  5. System Locked Pre-installation - Wikipedia

    en.wikipedia.org/wiki/System_Locked_Pre-installation

    System Locked Pre-installation (SLP), also referred to as OEM Activation, is a product activation procedure for Microsoft Windows used by major OEMs of laptops and pre-built PCs wherein a Windows product key is added and locked to the machine's firmware before mass distribution. SLP product keys cannot be moved to other machines.

  6. Microsoft Product Activation - Wikipedia

    en.wikipedia.org/wiki/Microsoft_Product_Activation

    In Windows 7 and later, significant hardware changes (e.g. motherboard) may require a re-activation. In Windows 10 and 11, a user can run the Activation Troubleshooter if the user has changed hardware on their device recently. If the hardware has changed again after activation, they must wait 30 days before running the troubleshooter again.

  7. ISO 128 - Wikipedia

    en.wikipedia.org/wiki/ISO_128

    ISO 8048:1984 Technical drawings — Construction drawings — Representation of views, sections and cuts; ISO 8560:2019 Technical drawings — Construction drawings — Representation of modular sizes, lines and grids; ISO 8826-1:1989 Technical drawings — Rolling bearings — Part 1: General simplified representation

  8. Product activation - Wikipedia

    en.wikipedia.org/wiki/Product_activation

    Product activation is a license validation procedure required by some proprietary software programs. Product activation prevents unlimited free use of copied or replicated software. Unactivated software refuses to fully function until it determines whether it is authorized to fully function. Activation allows the software to stop blocking its use.

  9. List of file signatures - Wikipedia

    en.wikipedia.org/wiki/List_of_file_signatures

    Mach-O binary (64-bit) FE ED FE ED: þíþí: 0 JKS Javakey Store [32] CE FA ED FE: Îúíþ: 0 Mach-O binary (reverse byte ordering scheme, 32-bit) [33] CF FA ED FE: Ïúíþ: 0 Mach-O binary (reverse byte ordering scheme, 64-bit) [33] 25 21 50 53 %!PS: 0 ps PostScript document: 25 21 50 53 2D 41 64 6F 62 65 2D 33 2E 30 20 45 50 53 46 2D 33 2E ...