When.com Web Search

  1. Ads

    related to: how to determine tile spacing between pavers in basement ceiling design

Search results

  1. Results From The WOW.Com Content Network
  2. Dropped ceiling - Wikipedia

    en.wikipedia.org/wiki/Dropped_ceiling

    Initially modern dropped ceilings were built using interlocking tiles and the only way to provide access for repair or inspection of the area above the tiles was by starting at the edge of the ceiling, or at a designated "key tile", and then removing contiguous tiles one at a time until the desired place of access was reached.

  3. Pavers (flooring) - Wikipedia

    en.wikipedia.org/wiki/Pavers_(flooring)

    Pavers manufactured from concrete go well with flag, brick and concrete walkways or patios. Concrete pavers may be used where winter temperatures dip below freezing. They are available in hole, x-shape, y-shape, pentagon, polygon and fan styles. An interlocking concrete paver, also known as a segmental paver, is a type of paver.

  4. Lists of uniform tilings on the sphere, plane, and hyperbolic ...

    en.wikipedia.org/wiki/Lists_of_uniform_tilings...

    Special cases are right triangles (p q 2). Uniform solutions are constructed by a single generator point with 7 positions within the fundamental triangle, the 3 corners, along the 3 edges, and the triangle interior. All vertices exist at the generator, or a reflected copy of it. Edges exist between a generator point and its image across a mirror.

  5. Drainage equation - Wikipedia

    en.wikipedia.org/wiki/Drainage_equation

    the design drain spacing (L) can be found from the equation in dependence of the drain depth (Dd) and drain radius (r). Drainage criteria One would not want the water table to be too shallow to avoid crop yield depression nor too deep to avoid drought conditions. This is a subject of drainage research.

  6. Permeable paving - Wikipedia

    en.wikipedia.org/wiki/Permeable_paving

    Impervious concrete pavers installed with ample void space between each paver function in the same way as pervious concrete pavers as they enable stormwater to drain into the voids between each paver, either filled with coarse aggregate or vegetation, to a stone and/or soil base layer for on-site infiltration and filtering. [4]

  7. Split-level home - Wikipedia

    en.wikipedia.org/wiki/Split-level_home

    The entry is between floors. The front door opens to a landing. One short flight of stairs leads up to the top floor; another short flight of stairs leads down. The top floor tends to be full height ceilings with the living room, dining room, kitchen, bedrooms and bathrooms. The lower floor often has lower ceilings and is partially below ground.

  8. List of aperiodic sets of tiles - Wikipedia

    en.wikipedia.org/.../List_of_aperiodic_sets_of_tiles

    In geometry, a tiling is a partition of the plane (or any other geometric setting) into closed sets (called tiles), without gaps or overlaps (other than the boundaries of the tiles). [1] A tiling is considered periodic if there exist translations in two independent directions which map the tiling onto itself.

  9. Catalan vault - Wikipedia

    en.wikipedia.org/wiki/Catalan_vault

    The Catalan vault (Catalan: volta catalana), also called thin-tile vault, [1] Catalan turn, Catalan arch, boveda ceiling (Spanish bóveda 'vault'), or timbrel vault, is a type of low brickwork arch forming a vaulted ceiling that often supports a floor above. It is constructed by laying a first layer of light bricks lengthwise "in space ...

  1. Ad

    related to: how to determine tile spacing between pavers in basement ceiling design