The measured depth is the length of the well including any angled or horizontal sections. Consider two wells, X and Y. Well X has a measured depth of 9,800 ft and a true vertical depth of 9,800 ft while well Y has measured depth of 10,380 ft while its true vertical depth is 9,800 ft.
Well depth values from the wireline loggers operation are referred to as "logger's depth". The loggers depth are typically considered more reliable than the drillers depth. The differences between loggers and drillers depths are due to different stretch in the drilling string when drilling, and the wire line entered into the bore hole during ...
Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream.
The tubing may also have flow control mechanism. Single-well concentric kill string: within the well a small diameter concentric kill string is used to circulate kill fluids when needed. Single-well 2-tubing completion: in this instance 2 tubing strings are inserted down 1 well. They are connected at the lower end by a circulating head.
CHK – choke (a restriction in a flowline or a system, usually referring to a production choke during a test or the choke in the well control system) CHKSR – checkshot survey report; CHKSS – checkshot survey log; CHOPS – cold heavy oil production with sand; CHP – casing hanger pressure (pressure in an annulus as measured at the casing ...
Multi-screen casing completion: the MLS is installed inside of a multi-screened steel or PVC well. Each well screen segment has a sand or gravel pack between it and the borehole wall, and is thus isolated from monitoring zones above and below by a grout or bentonite seal. The MLS is then constructed inside of the multi-screened well.
Driller's depth is always recorded, and it constitutes the primary depth system, unless it is later superseded by a more accurate measurement such as the depth from an open- or cased-hole wireline log. Driller's depth should always have 1) a unit of measurement e.g. meter or feet, 2) a datum reference e.g. rig floor.
The drill string will be removed from the wellbore to allow a logging crew to conduct a survey of the well. After the logging is completed at total depth, the crew will run the drill string back into the well and then proceed to lay it down when coming out of the hole prior to installing the final set of casing (the "production casing").