When.com Web Search

  1. Ads

    related to: hollow core concrete slab cost calculator estimate pdf

Search results

  1. Results From The WOW.Com Content Network
  2. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    Hollow-core slabs, also known as voided slabs, initially appeared as one-way elements in Europe during the 1950s, and are still commonly manufactured in precast form for applications where fast construction and low self-weight are required. [2] [6] Waffle slabs are

  3. Hollow-core slab - Wikipedia

    en.wikipedia.org/wiki/Hollow-core_slab

    The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.

  4. Filigree concrete - Wikipedia

    en.wikipedia.org/wiki/Filigree_concrete

    The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.

  5. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    However, this study concerned hollow concrete blocks and its results are unverified for concrete slabs. The actual value of k varies significantly in practice, and is usually between 0.8 and 2.0 W m −1 K −1. [8] This is relatively high when compared to other materials, for example the conductivity of wood may be as low as 0.04 W m −1 K −1.

  6. Elemental cost planning - Wikipedia

    en.wikipedia.org/wiki/Elemental_cost_planning

    Elemental cost planning is a system of Cost planning and Cost control, typically for buildings, which enables the cost of a scheme to be monitored during design development. 1951 saw the publication of the Ministry of Education Building Bulletin No 4 which essentially introduced the concept of elemental cost planning to the UK construction ...

  7. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...