Ad
related to: top loader balance vs analytical data value definition line plot analysis
Search results
Results From The WOW.Com Content Network
This may result in a degradation in performance depending on the balance between the resultant arithmetic intensity and the ridge point. Unlike "proper" ceilings, the resulting lines on the roofline plot are vertical barriers through which arithmetic intensity cannot pass without optimization.
Recurrence quantification analysis (RQA) is a method of nonlinear data analysis (cf. chaos theory) for the investigation of dynamical systems. It quantifies the number and duration of recurrences of a dynamical system presented by its phase space trajectory.
A ridgeline plot (also known as a joyplot [1] [note 1]) is a series of line plots that are combined by vertical stacking to allow the easy visualization of changes through space or time. The plots are often overlapped slightly to allow the changes to be more clearly contrasted. [2] [3] [4] [5]
Bland–Altman plot : In analytical chemistry and biostatistics this plot is a method of data plotting used in analysing the agreement between two different assays. It is identical to a Tukey mean-difference plot, which is what it is still known as in other fields, but was popularised in medical statistics by Bland and Altman. [2] [3]
In power engineering, the power-flow study, or load-flow study, is a numerical analysis of the flow of electric power in an interconnected system. A power-flow study usually uses simplified notations such as a one-line diagram and per-unit system, and focuses on various aspects of AC power parameters, such as Voltage, voltage angles, real power and reactive power.
The "biased mean" vertical line is found using the expression above for μ z, and it agrees well with the observed mean (i.e., calculated from the data; dashed vertical line), and the biased mean is above the "expected" value of 100. The dashed curve shown in this figure is a Normal PDF that will be addressed later.
Black = unfiltered data; red = data averaged every 10 points; blue = data averaged every 100 points. All have the same trend, but more filtering leads to higher r 2 of fitted trend line. The least-squares fitting process produces a value, r-squared ( r 2 ), which is 1 minus the ratio of the variance of the residuals to the variance of the ...
The method is as follows: from linear network analysis the output transfer function (that is output voltage against output current) is calculated for the network of resistor(s) and the generator driving them. This will be a straight line (called the load line) and can readily be superimposed on the transfer function plot of the non-linear ...