When.com Web Search

  1. Ad

    related to: hole depth diagram

Search results

  1. Results From The WOW.Com Content Network
  2. Kola Superdeep Borehole - Wikipedia

    en.wikipedia.org/wiki/Kola_Superdeep_Borehole

    The drilling of the fourth hole was stopped in April 1992 at 11,882 metres (38,983 ft) of depth. Drilling of the fifth hole started in April 1994 from 8,278 metres (27,159 ft) of depth of the third hole. Drilling was stopped in August 1994 at 8,578 metres (28,143 ft) of depth due to lack of funds and the well itself was mothballed. [7] [12]

  3. Deep hole drilling - Wikipedia

    en.wikipedia.org/wiki/Deep_hole_drilling

    According to the VDI Standard 3210, deep hole drilling processes are manufacturing processes for the machining of bore holes with diameters between D = 0.2...2000 mm and whose drilling depth is usually greater than three times the diameter. [1]

  4. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    For example, THRU may be stated in a hole dimension if the hole's end condition is not clear from graphical representation of the workpiece. [6] THRU ALL: Through all: Similar to THRU. Sometimes used on hole dimensions for clarity to denote that the hole extends through multiple open space features as it goes through the whole workpiece. [7] TIR

  5. Depth in a well - Wikipedia

    en.wikipedia.org/wiki/Depth_in_a_well

    The "total depth" for the well, core depths and all analysis of core / mud and other materials from the drilling hole are measured in "drillers depth". Well depth values from the wireline loggers operation are referred to as "logger's depth". The loggers depth are typically considered more reliable than the drillers depth.

  6. Hole - Wikipedia

    en.wikipedia.org/wiki/Hole

    Hole types in engineering: blind (left), through (middle), interrupted (right). In engineering, machining, and tooling, a hole may be a blind hole or a through hole (also called a thru-hole or clearance hole). A blind hole is a hole that is reamed, drilled, or milled to a specified depth without breaking through to the other side of the ...

  7. Casing (borehole) - Wikipedia

    en.wikipedia.org/wiki/Casing_(borehole)

    Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream.

  8. Driller's depth - Wikipedia

    en.wikipedia.org/wiki/Driller's_depth

    Driller's depth is always recorded, and it constitutes the primary depth system, unless it is later superseded by a more accurate measurement such as the depth from an open- or cased-hole wireline log. Driller's depth should always have 1) a unit of measurement e.g. meter or feet, 2) a datum reference e.g. rig floor.

  9. List of abbreviations in oil and gas exploration and production

    en.wikipedia.org/wiki/List_of_abbreviations_in...

    TD – total depth (depth of the end of the well; also a verb, to reach the final depth, used as an acronym in this case [citation needed]) TDD – total depth (driller) TDC - Top Dead Center; TDC – total drilling cost; TDL – total depth (logger) TDM – touch-down monitoring; TDP – touch-down point; TDS – top drive system; TDS ...