Search results
Results From The WOW.Com Content Network
A pit latrine generally consists of three major parts: a hole in the ground, a concrete slab or floor with a small hole, and a shelter. [7] The shelter is also called an outhouse. [10] The pit is typically at least three meters (10 ft) deep and one meter (3 ft) across. [7]
Two small holes are dug in the ground: one for the firewood and the other to provide a draft of air. Small twigs are packed into the fire hole and readily combustible material is set on top and lit. The fire burns from the top downward, drawing a steady, laminar stream of fresh air from the air hole as it burns.
Foundation with pipe fixtures coming through the sleeves. In engineering, a foundation is the element of a structure which connects it to the ground or more rarely, water (as with floating structures), transferring loads from the structure to the ground. Foundations are generally considered either shallow or deep. [1]
Putlog holes or putlock holes [1] are small holes made in the walls of structures to receive the ends of poles (small round logs) or beams, called putlogs or putlocks, to support a scaffolding. [2] Putlog holes may extend through a wall to provide staging on both sides of the wall.
The substructure of a building transfers the load of the building to the ground and isolates it horizontally from the ground. This includes foundations and basement retaining walls. [1] It is differentiated from the superstructure. It safeguards the building against the forces of wind, uplift, soil pressure etc.
A retaining wall is designed to hold in place a mass of earth or the like, such as the edge of a terrace or excavation. The structure is constructed to resist the lateral pressure of soil when there is a desired change in ground elevation that exceeds the angle of repose of the soil. [1]
Here an arrangement of them against pale striped walls awakens the library of Julia Amory's Southampton home alongside Colefax and Fowler’s Fuchsia chintz. Nick Mele Statement Screen
A large circular concrete was built at the bottom to form smooth channels for sewage to pass through. Brick wall was laid to raise up to be closer to the ground level. In this section, the wall diameters could be gradually smaller. Near the top, the brick wall diameters were rapidly reduced, forming a cone shape to meet a smaller diameter cover.