Search results
Results From The WOW.Com Content Network
A government experiment to test ventilatory threshold was held between November and December 2004. Subjects included 32 physically active males (age: 22.3; TV: 180.5; TM: 75.5 kg; VO2max: 57.1 mL/kg/min) encountered a continuous test of increasing loads on a treadmill, cardiorespiratory and other variables were observed using ECG (recording of ...
Tidal volume: that volume of air moved into or out of the lungs during quiet breathing (VT indicates a subdivision of the lung; when tidal volume is precisely measured, as in gas exchange calculation, the symbol TV or V T is used.) FRC: Functional residual capacity: the volume in the lungs at the end-expiratory position: RV/TLC%
TLC: Total lung capacity: the volume in the lungs at maximal inflation, the sum of VC and RV. TV: Tidal volume: that volume of air moved into or out of the lungs in 1 breath (TV indicates a subdivision of the lung; when tidal volume is precisely measured, as in gas exchange calculation, the symbol TV or V T is used.)
This page was last edited on 11 December 2020, at 18:55 (UTC).; Text is available under the Creative Commons Attribution-ShareAlike 4.0 License; additional terms may apply.
Transformer winding primary (usually high-voltage) connecting wires are of many types. They may be labeled as H 1, H 2 (sometimes H 0 if it is internally designed to be grounded) and X 1, X2 and sometimes an X 3 tap may be present. Sometimes a second isolated winding (Y 1, Y 2, Y 3) (and third (Z 1, Z 2, Z 3) may also be available on the same ...
This variation is typically between −4 mV/K and −2 mV/K depending on doping level. [8] For a change of 30 °C this results in significant variation from the 500 mV design parameter commonly used for the 90-nm technology node.
Ventricular tachycardia (V-tach or VT) is a cardiovascular disorder in which fast heart rate occurs in the ventricles of the heart. [3] Although a few seconds of VT may not result in permanent problems, longer periods are dangerous; and multiple episodes over a short period of time are referred to as an electrical storm.
The first VT tank, VT 1-1, was built in 1974 by Maschinenbau Kiel (MaK). One year later they produced the second VT tank, the VT 1–2. For further testing of the mobility and the concept of a tank with two main guns, five Gefechtsfeldversuchträger (GVT, 'battlefield test-beds') were designed and built in 1975 and 1976.