Search results
Results From The WOW.Com Content Network
Parts of the toll that has been operating is the 2.3-kilometre section IA (Waru–Sepanjang, inaugurated 27 August 2011 [2]) as well as the 18.47-kilometre section IV (Krian–Mojokerto, inaugurated 19 March 2016 [3]). While sections IB 4.3 km (Sepanjang-WRR), II 5.1 km (WRR-Driyorejo), and III 6.1 km (Driyorejo–Krian) are planned to be fully ...
Citra Margatama Surabaya Surabaya–Mojokerto Toll Road: 36.27 Jasamarga Surabaya Mojokerto Jombang–Mojokerto Toll Road: 40.5 Astra Tol Nusantara Ngawi–Kertosono Toll Road: 87 Jasamarga Ngawi Kertosono Kediri Surabaya–Gresik Toll Road: 21 Margabumi Matraraya Surabaya–Gempol Toll Road: 43 Jasa Marga Gempol–Pandaan Toll Road: 14 Jasa ...
The 38.5-kilometre (23.9 mi) Pandaan-Malang Toll Road is divided into five sections: Section 1 (15.5 kilometres (9.6 mi)) between Pandaan and Purwodadi, Section 2 (8.1 kilometres (5.0 mi) between Purwodadi and Lawang, Section 3 7.1 kilometres (4.4 mi) between Lawang and Singosari, Section 4 (4.8 kilometres (3.0 mi) between Singosari and Pakis ...
Mojokerto (Javanese: ꦩꦗꦏꦼꦂꦠ (Måjåkěrtå)) is a city in East Java Province of Indonesia. [4] It is located 40 km southwest of Surabaya , the provincial capital, and constitutes one of the component units of the Surabaya metropolitan area (known as Gerbangkertosusila ) which comprises Gresik Regency , Bangkalan Regency , Mojokerto ...
Section III, Boboh-Bunder (6.02 km (3.74 mi)) Section IV, Bunder-Manyar (9.39 km (5.83 mi)) Sections I, II, and III which links Krian and Bunder along 29 kilometers were inaugurated by the Governor of East Java, Khofifah Indar Parawansa on November 28, 2020. While Section IV was planned to be built on 2021. [3]
[3] [4] It has an area of 6,310.06 km 2, and at the 2020 Census had a population of 9,924,509, [5] rising to 9,975,878 according to the official estimates as at mid 2022. [6] The national government regards the Surabaya Metropolitan Area as including only Surabaya, Sidoarjo Regency, and Gresik Regency, known as "Zona Surabaya Raya". [7]
The 19.9 kilometers (12.4 mi) Section 2 links Kedunglosari-Tembelang-Jombang Village with the Pageruyung-Gedeg Village-Mojokerto District and section 4 which is a connection with Solo-Kertosono Toll Road, stretching between Gondangmanis to Brodot in Bandar Kedungmulyo, Jombang was inaugurated by Indonesian President Joko Widodo on 10 September ...
The toll road has been operating since 1986 and has served as the primary access for Surabaya-Malang or Surabaya-Pasuruan routes, which are among East Java's main industrial areas. [ 2 ] Since August 2006, this toll road has been disrupted due to the mud flood event that inundated this toll road at a point 36 kilometers (22 mi) from Surabaya ...