When.com Web Search

  1. Ads

    related to: construction angle calculator with slope

Search results

  1. Results From The WOW.Com Content Network
  2. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    But in practice the usual way to calculate slope is to measure the distance along the slope and the vertical rise, and calculate the horizontal run from that, in order to calculate the grade (100% × rise/run) or standard slope (rise/run). When the angle of inclination is small, using the slope length rather than the horizontal displacement (i ...

  3. Roof pitch - Wikipedia

    en.wikipedia.org/wiki/Roof_pitch

    In trigonometric expression, exact roof slope in degrees is given by the arctangent. For example: arctan(3 ⁄ 12) = 14.0°. Framing carpenters cut rafters on an angle to "pitch" a roof. Lower pitched roof styles allow for lower structures with a corresponding reduction in framing and sheathing materials.

  4. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  5. Deflection (engineering) - Wikipedia

    en.wikipedia.org/wiki/Deflection_(engineering)

    It may be quantified in terms of an angle (angular displacement) or a distance (linear displacement). A longitudinal deformation (in the direction of the axis) is called elongation . The deflection distance of a member under a load can be calculated by integrating the function that mathematically describes the slope of the deflected shape of ...

  6. Topographic Abney level - Wikipedia

    en.wikipedia.org/wiki/Topographic_Abney_Level

    To measure lines on a particular slope, the desired angle or grade is first set on the level and then the surveyor sights through the sighting tube and brings the cross-hair in line with the bubble in the level while viewing the target. This allows the surveyor to see if the target is above or below the line of sight.

  7. Total station - Wikipedia

    en.wikipedia.org/wiki/Total_station

    It is an electronic transit theodolite integrated with electronic distance measurement (EDM) to measure both vertical and horizontal angles and the slope distance from the instrument to a particular point, and an on-board computer to collect data and perform triangulation calculations.