Ads
related to: palletized load system trailer cte 40 x- 3888 Stelzer Road, Columbus, Ohio · Directions · +1 614-934-6211
Search results
Results From The WOW.Com Content Network
The Palletized Load System (PLS) is based around two variants of prime mover truck (M1074 and M1075) fitted with an integral self-loading and unloading capability, a trailer (M1076), and demountable cargo beds, referred to as flatracks. PLS trucks and trailers are air-transportable in C-5A and C-17 cargo aircraft. [2]
The Palletized Load System is designed to provide ground transportation for dry and refrigerated containers with a container roll-in/roll-out platform (CROP) or other types of cargo on PLS flatracks. When equipped with tank racks or load handling system compatible water tank racks (HIPPOs) it can also transport bulk petroleum products or water.
The Family of Heavy Tactical Vehicles (FHTV) contract was awarded to Oshkosh by the U.S. Army in March 2001. In addition to the HEMTT (both new and re-manufacture), the contract covered the M1070 HET, M1074, and M1075 Palletized Load System (PLS) trucks, and M1076 PLS trailers and called for up to 5,398 trucks and 1,100 trailers (including ...
Two cargo trailers are part of the Family of Medium Tactical Vehicles (FMTV). The M1082 single-axle trailer is used with the LMTV cargo truck. The M1095 twin-axle trailer is used with the MTV cargo truck. Both trailers have payloads that match that of the towing truck, and they share many components, including axles, with the towing truck. [1] [6]
M1074 truck, palletized loading, 10 × 10 with material handling crane and 20K winch – palletized load system; M1075 truck, palletized loading, 10 x 10 w/o material handling crane – palletized load system; M1076 palletized load system trailer (PLST) – palletized load system; M1077 truck, flatrack, palletized load system, (PLST)
The intent was that the EHETS would comprise a tractor and semi-trailer to transport, recover, and evacuate a +80 tonne (72,575 kg) combat loaded M1 Abrams and associated M88 recovery system, which was anticipated to weigh more than 84,000 kg. The M1070A1 and M1000 are technically unable to transport such loads. [7]