Search results
Results From The WOW.Com Content Network
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
When the masterwork is finished, a cast is made using synthetic liquid rubber, and from this cast, form liners are produced in the reverse image of the original. A form liner panel is placed on the inside of a concrete forming system before the concrete has been poured and acts as a mold for the concrete to be formed against. Once the concrete ...
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
A concrete spacer with a plastic clip in use Concrete spacers in a precast element Diaphragm wall block on rebar for a Diaphragm wall A rebar spacer is a short, rod-like device used to secure reinforcing steel bars, or rebar , within cast assemblies for reinforced concrete structures.
A list, usually tabular and often on the drawing (if not accompanying the drawing on a separate sheet), listing the parts needed in an assembly, including subparts, standard parts, and hardware. There is no consistently enforced distinction between an L/M, a BoM, or a P/L. PLM: product lifecycle management; plant lifecycle management: See also ...
A precast concrete walled house under construction An example of low-quality precast concrete with exposed dowels, connectors, indications of cracks, and malformations, even during its installation, Barangay Lantic, Carmona, Cavite, Philippines Interior view of the walls, supports, and roof of a precast commercial shop in Williston, North Dakota, US.
A pile cap is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation. It usually forms part of the deep foundation of a building, typically a multi-story building, structure or support base for heavy equipment, or of a bridge.
The cap is the part that supports the bearing pads. Depending on the type of support structure, there may or may not be a cap. Wall piers and stub abutments do not require a cap, while a multi-column, hammerhead, or pile-bent pier will have a cap. The stem or stub is the main body of the foundation. It transfers the load from the superstructure ...