Search results
Results From The WOW.Com Content Network
OSM Regional Structure Map. The Office of Surface Mining Reclamation and Enforcement (OSMRE) is a branch of the United States Department of the Interior.It is the federal agency entrusted with the implementation and enforcement of the Surface Mining Control and Reclamation Act of 1977 (SMCRA), which attached a per-ton fee to all extracted coal in order to fund an interest-accruing trust to be ...
The company pumped water from the underground Navajo Aquifer for washing coal, and, until 2005, in a slurry pipeline operation to transport extracted coal 273 mi (439 km) to the Mohave Generating Station in Laughlin, Nevada. With the pipeline operating, Peabody pumped an average of 3 million gallons of water from the Navajo Aquifer every day. [3]
Navajo Generating Station was a 2.25-gigawatt (2,250 MW), coal-fired power plant located on the Navajo Nation, near Page, Arizona, United States. This plant provided electrical power to customers in Arizona, Nevada , and California .
The Navajo Mine is a surface coal mine owned and operated by Navajo Transitional Energy Company (NTEC) in New Mexico, United States, within the Navajo Nation. The mine is about 20.5 miles (33 km) southwest of Farmington, New Mexico. The Navajo Mine Railroad has 13.8 miles (22.2 km) of track between the Four Corners Generating Station and Navajo ...
Page was founded in 1957 as a housing community for workers and their families during the construction of nearby Glen Canyon Dam on the Colorado River. Its 17-square-mile (44 km 2) site was obtained in a land exchange with the Navajo Nation. The city is perched atop Manson Mesa at an elevation of 4,300 feet (1,300 m) above sea level and 600 ...
Here's what's involved in closing a 60-year-old power plant. The long-planned shut down of We Energies' Oak Creek Coal plant begins in May. Here's what's involved in closing a 60-year-old power plant.
This is a list of Superfund sites in the U.S. State of Colorado designated under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) environmental law. The CERCLA federal law authorized the United States Environmental Protection Agency (EPA) to create a list of polluted locations requiring a long-term ...
The Navajo Unit consists of the Navajo Dam and the Navajo Lake reservoir. The dam impounds the San Juan River near Farmington, New Mexico. The dam was completed in 1963, and was actually the first of the units in the project to be completed. Unlike the subsequent dams, Navajo Dam did not have any power generating capacity when built.