Ads
related to: magnumstone base leveling pad trench
Search results
Results From The WOW.Com Content Network
To construct a rubble trench foundation a narrow trench is dug down below the frost line. The bottom of the trench would ideally be gently sloped to an outlet. Drainage tile, graded 1":8' to daylight, is then placed at the bottom of the trench in a bed of washed stone protected by filter fabric. The trench is then filled with either screened ...
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Launch Complex 39A (LC-39A) is the first of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida.The pad, along with Launch Complex 39B, was first constructed in the 1960s to accommodate the Saturn V launch vehicle, and has been used to support NASA crewed space flight missions, including the historic Apollo 11 moon landing and the Space Shuttle.
The pad was reinforced with pilings and features a liquid fueling facility, flame trench, and deluge system for cooling and sound suppression. The pad is capable of supporting a gross liftoff weight of 453.6 metric tons (1,000,000 lb) and can launch payloads of up to 5,035 kilograms (11,100 lb) into low Earth orbit. [7]
Connections between the Launch Control Center, Mobile Launcher Platform, and space vehicle were made in the Pad Terminal Connection Room (PTCR), which was a two-story series of rooms located beneath the launch pad on the west side of the flame trench. The "room" was constructed of reinforced concrete and protected by up to 20 feet (6.1 m) of ...
The level must be horizontal to get a valid measurement. Because of this, if the horizontal crosshair of the instrument is lower than the base of the rod, the surveyor will not be able to sight the rod and get a reading. The rod can usually be raised up to 25 feet high, allowing the level to be set much higher than the base of the rod.