Search results
Results From The WOW.Com Content Network
VBA 6.0 and VBA 6.1 were launched in 1999, notably with support for COM add-ins in Office 2000. VBA 6.2 was released alongside Office 2000 SR-1. VBA 6.3 was released after Office XP, VBA 6.4 followed Office 2003 and VBA 6.5 was released with Office 2007. Office 2010 includes VBA 7.0.
An electromagnetic wave propagating along a path C has the phase shift over C as if it was propagating a path in a vacuum, length of which, is equal to the optical path length of C. Thus, if a wave is traveling through several different media, then the optical path length of each medium can be added to find the total optical path length. The ...
The critical path of a carry-skip-adder begins at the first full-adder, passes through all adders and ends at the sum-bit .Carry-skip-adders are chained (see block-carry-skip-adders) to reduce the overall critical path, since a single -bit carry-skip-adder has no real speed benefit compared to a -bit ripple-carry adder.
The path length of a simple conditional instruction would normally be considered as equal to 2, [citation needed] one instruction to perform the comparison and another to take a branch if the particular condition is satisfied. The length of time to execute each instruction is not normally considered in determining path length and so path length ...
Formulas in the B column multiply values from the A column using relative references, and the formula in B4 uses the SUM() function to find the sum of values in the B1:B3 range. A formula identifies the calculation needed to place the result in the cell it is contained within. A cell containing a formula, therefore, has two display components ...
On the high-level layer, the path between the clusters is planned. After the plan was found, a second path is planned within a cluster on the lower level. [9] That means, the planning is done in two steps which is a guided local search in the original space. The advantage is that the number of nodes is smaller and the algorithm performs very ...
Fitting of a noisy curve by an asymmetrical peak model, with an iterative process (Gauss–Newton algorithm with variable damping factor α).Curve fitting [1] [2] is the process of constructing a curve, or mathematical function, that has the best fit to a series of data points, [3] possibly subject to constraints.
Average path length, the average number of steps along the shortest paths for all possible pairs of network nodes; Hop count, the number of intermediate network devices through which data must pass between source and destination in a computer network