When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Visual Basic for Applications - Wikipedia

    en.wikipedia.org/wiki/Visual_Basic_for_Applications

    VBA 6.0 and VBA 6.1 were launched in 1999, notably with support for COM add-ins in Office 2000. VBA 6.2 was released alongside Office 2000 SR-1. VBA 6.3 was released after Office XP, VBA 6.4 followed Office 2003 and VBA 6.5 was released with Office 2007. Office 2010 includes VBA 7.0.

  3. Optical path length - Wikipedia

    en.wikipedia.org/wiki/Optical_path_length

    An electromagnetic wave propagating along a path C has the phase shift over C as if it was propagating a path in a vacuum, length of which, is equal to the optical path length of C. Thus, if a wave is traveling through several different media, then the optical path length of each medium can be added to find the total optical path length. The ...

  4. Carry-skip adder - Wikipedia

    en.wikipedia.org/wiki/Carry-skip_adder

    The critical path of a carry-skip-adder begins at the first full-adder, passes through all adders and ends at the sum-bit .Carry-skip-adders are chained (see block-carry-skip-adders) to reduce the overall critical path, since a single -bit carry-skip-adder has no real speed benefit compared to a -bit ripple-carry adder.

  5. Instruction path length - Wikipedia

    en.wikipedia.org/wiki/Instruction_path_length

    The path length of a simple conditional instruction would normally be considered as equal to 2, [citation needed] one instruction to perform the comparison and another to take a branch if the particular condition is satisfied. The length of time to execute each instruction is not normally considered in determining path length and so path length ...

  6. Spreadsheet - Wikipedia

    en.wikipedia.org/wiki/Spreadsheet

    Formulas in the B column multiply values from the A column using relative references, and the formula in B4 uses the SUM() function to find the sum of values in the B1:B3 range. A formula identifies the calculation needed to place the result in the cell it is contained within. A cell containing a formula, therefore, has two display components ...

  7. Pathfinding - Wikipedia

    en.wikipedia.org/wiki/Pathfinding

    On the high-level layer, the path between the clusters is planned. After the plan was found, a second path is planned within a cluster on the lower level. [9] That means, the planning is done in two steps which is a guided local search in the original space. The advantage is that the number of nodes is smaller and the algorithm performs very ...

  8. Curve fitting - Wikipedia

    en.wikipedia.org/wiki/Curve_fitting

    Fitting of a noisy curve by an asymmetrical peak model, with an iterative process (Gauss–Newton algorithm with variable damping factor α).Curve fitting [1] [2] is the process of constructing a curve, or mathematical function, that has the best fit to a series of data points, [3] possibly subject to constraints.

  9. Path length - Wikipedia

    en.wikipedia.org/wiki/Path_length

    Average path length, the average number of steps along the shortest paths for all possible pairs of network nodes; Hop count, the number of intermediate network devices through which data must pass between source and destination in a computer network