Ads
related to: setting up a sluice box for concrete block
Search results
Results From The WOW.Com Content Network
A sluice gate. A sluice (/ s l u s / SLOOS) is a water channel containing a sluice gate, a type of lock to manage the water flow and water level. It can also be an open channel which processes material, such as a river sluice used in gold prospecting or fossicking. A mill race, leet, flume, penstock or lade is a sluice channeling water toward a ...
Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
Today, the rocker box is not used as extensively as the sluice, but still is an effective method of recovering gold in areas where there is not enough available water to operate a sluice effectively. Like a sluice box, the rocker box has riffles and a carpet in it to trap gold. It was designed to be used in areas with less water than a sluice box.
Tetrapods used to protect a seawall Large interlocked Xblocs (8.0 m 3 or 280 cu ft) in a trial placement. A wave-dissipating concrete block is a naturally or manually interlocking concrete structure designed and employed to minimize the effects of wave action upon shores and shoreline structures, such as quays and jetties.
A pallet of "8-inch" concrete blocks An interior wall of painted concrete blocks Concrete masonry blocks A building constructed with concrete masonry blocks. A concrete block, also known as a cinder block in North American English, breeze block in British English, or concrete masonry unit (CMU), or by various other terms, is a standard-size rectangular block used in building construction.
The Fusegate blocks act as a fixed weir most of the time, but in excessive flood conditions they are designed to topple forward, allowing the controlled discharge of water. Multiple fusegates are generally set up side by side, with each fusegate designed to release under progressively extreme flooding, thus minimizing the impact of the ...
What links here; Related changes; Upload file; Special pages; Permanent link; Page information; Cite this page; Get shortened URL; Download QR code
A long sluice box runs along the mine. [16] The sluice box was used extensively during the California gold rush for larger scale operations. When streams became increasingly depleted, the grizzly and undercurrent variants of the sluice box were developed. The grizzly is a set of parallel bars placed at a 45-degree angle over the main sluice box ...