When.com Web Search

  1. Ad

    related to: track setting equipment diagram

Search results

  1. Results From The WOW.Com Content Network
  2. Track circuit - Wikipedia

    en.wikipedia.org/wiki/Track_circuit

    The basic principle behind the track circuit lies in the connection of the two rails by the wheels and axle of locomotives and rolling stock to short an electrical circuit. This circuit is monitored by electrical equipment to detect the absence of the trains. Since this is a safety appliance, fail-safe operation is crucial. Hence the circuit is ...

  3. Railroad switch - Wikipedia

    en.wikipedia.org/wiki/Railroad_switch

    A right-hand railroad switch with point indicator pointing to right Animated diagram of a right-hand railroad switch. Rail track A divides into two: track B (the straight track) and track C (the diverging track); note that the green line represents direction of travel only, the black lines represent fixed portions of track, and the red lines depict the moving components.

  4. Track geometry - Wikipedia

    en.wikipedia.org/wiki/Track_geometry

    Track gauge or rail gauge (also known as track gage in North America [8]) is the distance between the inner sides (gauge sides) of the heads of the two load bearing rails that make up a single railway line. Each country uses different gauges for different types of trains.

  5. Railway signalling - Wikipedia

    en.wikipedia.org/wiki/Railway_signalling

    The set of rules and the physical equipment used to accomplish this determine what is known as the method of working (UK), method of operation (US) or safe-working (Aus.). Not all these methods require the use of physical signals , and some systems are specific to single-track railways.

  6. Communications-based train control - Wikipedia

    en.wikipedia.org/wiki/Communications-based_train...

    Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurately than with traditional signaling systems.

  7. Signalling control - Wikipedia

    en.wikipedia.org/wiki/Signalling_control

    To set a route, the signalman operates the device for the 'entrance' signal, followed by the device for the 'exit' (destination) signal. All points within the route are automatically set to the required position and, provided all the points are detected by the interlocking in the correct position, the entrance signal will clear.

  8. Track spacing - Wikipedia

    en.wikipedia.org/wiki/Track_spacing

    Measurement of track spacing from the rail head to rail head. By definition, the track spacing is given from centre to centre of a rail track. For an actual construction the distance is measured from the inside of a rail head to the matching one of the other track. As far as both tracks have the same gauge this is the same distance.

  9. Track geometry car - Wikipedia

    en.wikipedia.org/wiki/Track_geometry_car

    A track geometry car (also known as a track recording car) is an automated track inspection vehicle on a rail transport system used to test several parameters of the track geometry without obstructing normal railroad operations. Some of the parameters generally measured include position, curvature, alignment of the track, smoothness, and the ...

  1. Ad

    related to: track setting equipment diagram