When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. List of railroad truck parts - Wikipedia

    en.wikipedia.org/wiki/List_of_railroad_truck_parts

    An axlebox, also known as a journal box in North America, is the mechanical subassembly on each end of the axles under a railway wagon, coach or locomotive; it contains bearings and thus transfers the wagon, coach or locomotive weight to the wheels and rails; the bearing design is typically oil-bathed plain bearings on older rolling stock, or roller bearings on newer rolling stock.

  3. File:Door Swing Diagram.svg - Wikipedia

    en.wikipedia.org/wiki/File:Door_Swing_Diagram.svg

    You are free: to share – to copy, distribute and transmit the work; to remix – to adapt the work; Under the following conditions: attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made.

  4. 555 timer IC - Wikipedia

    en.wikipedia.org/wiki/555_timer_IC

    The internal block diagram and schematic of the 555 timer are highlighted with the same color across all three drawings to clarify how the chip is implemented: [2] Voltage divider : Between the positive supply voltage V CC and the ground GND is a voltage divider consisting of three identical resistors (5 kΩ for bipolar timers, 100 kΩ or ...

  5. Ring circuit - Wikipedia

    en.wikipedia.org/wiki/Ring_circuit

    Spur circuits attached to the ring can overheat if not fused at the spur-point (i.e., if a BS 5733 or similar fused spur is not used) This is almost certainly a breach of the appropriate electrical standards (e.g. BS 7671 in the UK): the maximum load on any unfused spur is a single fitting.

  6. Lever frame - Wikipedia

    en.wikipedia.org/wiki/Lever_frame

    A mechanical lever frame inside the signal box at Knockcroghery in Ireland Waterloo station A signalbox, LSWR (Howden, Boys' Book of Locomotives, 1907). Mechanical railway signalling installations rely on lever frames for their operation to interlock the signals, track locks [1] and points to allow the safe operation of trains in the area the signals control.

  7. Stop-and-wait ARQ - Wikipedia

    en.wikipedia.org/wiki/Stop-and-wait_ARQ

    A stop-and-wait ARQ sender sends one frame at a time; it is a special case of the general sliding window protocol with transmit and receive window sizes equal to one in both cases. After sending each frame, the sender doesn't send any further frames until it receives an acknowledgement (ACK) signal.

  8. List of gear nomenclature - Wikipedia

    en.wikipedia.org/wiki/List_of_gear_nomenclature

    In the adjacent diagram, (a) and (b) are referred to as having an offset below center, while those in (c) and (d) have an offset above center. In determining the direction of offset, it is customary to look at the gear with the pinion at the right. For below center offset the pinion has a left hand spiral, and for above center offset the pinion ...

  9. File:555 Astable Diagram.svg - Wikipedia

    en.wikipedia.org/wiki/File:555_Astable_Diagram.svg

    Date/Time Thumbnail Dimensions User Comment; current: 21:06, 18 February 2012: 275 × 250 (27 KB) Wdwd: fix connection (dot in the upper left corner) SVG optimization : 21:49, 13 January 2010: 275 × 250 (43 KB) Jack1993jack {{Information |Description=Circuit diagram of a standard 555 Astable circuit.